How Many Ground Control Points Do You Need for Drone Surveying? Malaysia
How Many Ground Control Points Do You Need for Drone Surveying?
Planning a drone survey and wondering:
“How many Ground Control Points do I need?”
There is no single number that is correct for every project.
The appropriate Ground Control Point—or GCP—plan depends on factors such as:
SITE SIZE
SITE SHAPE
TERRAIN
REQUIRED OUTPUT
DRONE / CAMERA SYSTEM
SURVEY METHODOLOGY
CONTROL DISTRIBUTION
PROJECT ACCURACY REQUIREMENTS
Simply adding more GCPs does not automatically produce a better survey.
The more important question is:
ARE YOUR CONTROL POINTS SUITABLY PLANNED AND DISTRIBUTED FOR THE PROJECT?
What Is a Ground Control Point?
A Ground Control Point is a known reference position used within a surveying or mapping workflow.
For drone and aerial mapping applications, a visible target may be placed at the known position so it can be identified in captured imagery.
Typical applications include:
Construction Progress Mapping
Topographic Mapping
Earthwork Surveys
Stockpile Surveys
Road Projects
Infrastructure Mapping
Land Development
Quarry Mapping
Site Documentation
GCPs help connect aerial imagery with survey control.
Is There a Minimum Number of GCPs?
There is no universal minimum that MTM Precision would recommend for every project.
A small, simple site and a large irregular infrastructure corridor clearly do not have the same requirements.
Professional planning should consider the project geometry and required deliverables.
Do not choose the GCP quantity simply because another surveyor used the same number on a different project.
Why Is Distribution So Important?
Imagine placing several GCPs very close together in one corner of a large site.
Technically, you have many control points.
But they may provide poor coverage of the rest of the project.
This demonstrates an important principle:
QUANTITY ≠ DISTRIBUTION
Control should be planned across the survey area according to the project methodology.
A smaller number of well-planned points can be more meaningful than many poorly positioned targets.
What Factors Affect GCP Quantity?
1. Project Area
A larger survey area may require a different control strategy from a small building site.
But area alone should not determine the quantity.
2. Site Shape
A compact rectangular site is different from:
A long highway corridor
Pipeline route
Irregular development
Large industrial complex
Quarry
Geometry matters.
3. Terrain
Flat open land and highly variable terrain may require different planning.
Consider:
Slopes
Elevation changes
Buildings
Obstructions
Vegetation
Visibility
4. Required Survey Output
Ask what the drone data will be used for.
For example:
General site documentation
and
Professional survey deliverables
may have very different control requirements.
5. Required Accuracy
The project specification should drive the survey methodology.
Do not decide GCP quantity first and then hope the resulting workflow meets the required accuracy.
GCP Quantity vs GCP Size
These are two separate decisions.
First:
How many control targets does the project require?
Then:
What target size is appropriate?
MTM Precision supplies GCP targets in:
50 × 50 cm
100 × 100 cm
150 × 150 cm
The correct size depends on the intended visibility and survey workflow.
When Should You Use 50 × 50 cm?
Consider 50 × 50 cm when:
Compact transportation is important
The target remains sufficiently visible
The project conditions suit a smaller target
This size is easier to carry and deploy around suitable sites.
When Should You Use 100 × 100 cm?
The 100 × 100 cm option provides more physical target area.
It can be considered when you want a practical balance between:
VISIBILITY + FIELD HANDLING
For many customers comparing sizes, this is a useful middle option to evaluate.
When Should You Use 150 × 150 cm?
Consider 150 × 150 cm when the application benefits from a larger visible target and site logistics allow it.
However:
BIGGER DOES NOT AUTOMATICALLY MEAN BETTER.
Larger targets require more:
Storage space
Transport space
Deployment area
Choose according to the application.
Does Flight Height Affect GCP Size?
Potentially.
As the operating height increases, a physical target generally occupies a smaller portion of the captured image.
But target visibility also depends on:
Camera resolution
Lens
Ground Sampling Distance
Target contrast
Image quality
Processing workflow
Therefore, GCP size should not be selected using flight height alone.
Where Should Ground Control Points Be Located?
Exact control design depends on the survey methodology.
But the key principle is:
Avoid thinking only about the number of targets.
Think about their distribution across the project.
Depending on the application, the control plan may need to consider:
Project boundaries
Interior coverage
Changes in elevation
Irregular site geometry
Visibility
Safe access
Stable ground
Long-term point security where required
Professional control design should follow the project's survey requirements.
Should All GCPs Be Placed Around the Boundary?
Not automatically.
Placing targets only around the outside of a project may not be appropriate for every survey.
Likewise, placing everything near the centre is not automatically correct.
Control distribution should reflect:
Site geometry + terrain + survey methodology + required output
rather than following a universal pattern.
What Is a Check Point?
A project may also use known points to independently evaluate the resulting survey or mapping output.
This is different from simply using every known point in exactly the same way.
The distinction between control points and check points depends on the project workflow.
This is another reason why:
“How many GCPs?”
cannot always be answered with one fixed number.
How Do You Know the Coordinates of a GCP?
A visible target does not automatically become a Ground Control Point simply because it is placed on the ground.
Its position needs to be determined according to the required survey methodology.
Professional survey equipment may include:
GNSS / RTK
or
TOTAL STATION
depending on the application.
This connects drone mapping with conventional professional surveying.
Using a Total Station for Survey Control
Where a Total Station forms part of the control workflow, the instrument setup also deserves attention.
Think about the complete chain:
KNOWN REFERENCE
↓
TRIPOD
↓
TOTAL STATION
↓
CONTROL / GCP
↓
DRONE SURVEY
↓
PROCESSING
The tripod provides the physical support underneath the precision instrument.
Why Tripod Stability Matters
For professional Total Station work, the tripod should provide an appropriate stable platform.
For surveyors prioritizing rigidity and vibration resistance, MTM Precision supplies the:
Myzox PMWS2-OL Precision Wooden Tripod
The PMWS2-OL is designed around:
TORSIONAL RIGIDITY
VIBRATION RESISTANCE
and
WELL-BALANCED MOBILITY + STABILITY
Myzox PMWS2-OL Key Specifications
Weight: 5.2 kg
Extended Length: 1,662 mm
Closed Length: 1,014 mm
Head Type: Flat
Tripod Head: 154 / 66 mm
Lock: Screw Lock
Country of Origin: Japan
This makes the PMWS2-OL relevant to professional control, Total Station and precision surveying applications.
Do You Need a Wooden Tripod for Every GCP Project?
No.
A GCP project does not automatically require a wooden tripod.
The tripod requirement depends on the survey equipment and control methodology being used.
If your workflow involves a Total Station and greater emphasis is placed on stable instrument support, a professional wooden tripod may be appropriate.
If another control method is being used, the equipment requirement may be different.
Choose the system according to the project.
Common GCP Planning Mistakes
Mistake 1 – Buying Targets Before Planning the Survey
First understand the project requirements.
Mistake 2 – Assuming More GCPs Always Means Better Results
Good distribution matters.
Mistake 3 – Choosing the Biggest Target Automatically
Select the size according to visibility and workflow.
Mistake 4 – Ignoring Terrain
Elevation changes and site geometry can influence control planning.
Mistake 5 – Treating a Visible Target as a Known Coordinate
A GCP still requires an appropriately determined position.
Mistake 6 – Forgetting Check Points
Professional workflows may require independent verification rather than using every known point identically.
Planning a Drone Survey in Malaysia?
Before ordering Ground Control Point targets, prepare the following information:
1. Approximate site area
2. Site shape
3. Terrain
4. Drone model
5. Camera / sensor
6. Planned operating height
7. Required survey output
8. Control method
9. Required target quantity
10. Preferred GCP size
This gives MTM Precision a much better basis for discussing the equipment requirement.
Ground Control Point Solutions from MTM Precision
Available target sizes include:
50 × 50 cm Ground Control Point
100 × 100 cm Ground Control Point
150 × 150 cm Ground Control Point
MTM Precision also supplies professional surveying equipment and accessories including:
Myzox PMWS2-OL Precision Wooden Tripod
Total Station Accessories
Myzox SC-2500S Prism Target Set
Myzox Monitoring Prism
Myzox L-Bar Monitoring Prism
Survey Markers & Control Accessories
This allows customers to build a more complete surveying and control workflow rather than purchasing an isolated target.
Contact MTM Precision
MTM Precision Sdn Bhd
Website: www.mtmpre.com.my
Email: mtmpre@yahoo.com
WhatsApp: 016-660 7346
Showroom & Service Centre
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
Supporting surveying, construction, drone mapping and engineering customers throughout Selangor, Kuala Lumpur, Johor, Penang, Sarawak, Sabah, Melaka, Negeri Sembilan, Perak, Pahang, Kedah, Perlis and Terengganu.
For Ground Control Point targets, 50 × 50 / 100 × 100 / 150 × 150 GCP sizes, Myzox PMWS2-OL, Total Station accessories or professional surveying equipment in Malaysia, contact MTM Precision.
15 Sep 2026