TOKNAV RTK Base and Rover Setup with TBase Malaysia

TOKNAV RTK Base and Rover Setup with TBase Malaysia

 

A TOKNAV RTK Base and Rover system allows a surveying team to generate and transmit its own correction data without depending entirely on an external CORS or mobile-network correction service.

 

A typical TOKNAV configuration combines the TBase GNSS base station with either a T50 or T10 Pro Rover, a data controller and professional survey software.

 

This guide explains the basic setup workflow and the important checks required before using a Base and Rover RTK system in Malaysia.

 

Main Components of the System

 

A complete setup normally includes:

 

TOKNAV TBase receiver

 

TOKNAV T50 or T10 Pro Rover

 

Compatible data controller

 

Survey software

 

Base tripod or fixed support

 

Rover survey pole

 

UHF radio antennas

 

Tribrach or mounting accessories where required

 

Chargers and communication cables

 

Measuring tape or instrument-height tool

 

Known control-point information

 

The exact accessories and controller model should be confirmed before ordering.

 

Role of the TBase

 

The TOKNAV TBase is installed at a stable location and configured as the RTK reference station.

 

Its key specifications include:

 

1,408 GNSS channels

 

Integrated 410–470 MHz UHF radio

 

Selectable 1W, 2W and 5W radio power

 

13,800mAh battery

 

More than 12 hours of stated operation in Base mode using the 5W radio

 

IP68 protection

 

32GB internal storage

 

The Base observes satellite signals and transmits correction data to the Rover.

 

Choosing the Rover

 

TOKNAV T10 Pro

 

The T10 Pro is suitable for standard engineering RTK work such as:

 

Topographic survey

 

Construction setting out

 

Control-point measurement

 

Road and drainage projects

 

Earthwork measurement

 

It provides 1,408 GNSS channels, IMU tilt measurement, an integrated UHF radio and IP68 protection.

 

TOKNAV T50

 

The T50 adds:

 

100m green laser

 

Inaccessible-point measurement

 

AR stakeout

 

IMU tilt measurement

 

It is more suitable for complex sites involving drains, trenches, building corners, slopes and other difficult-to-reach points.

 

Step 1: Confirm the Coordinate System

 

Before setting up the equipment, confirm the coordinate system required for the project.

 

This may include:

 

Datum

 

Projection

 

Zone

 

Geoid model

 

Site calibration

 

Local grid parameters

 

Units

 

Control-point coordinates

 

Using the wrong coordinate system can produce measurements that appear internally consistent but do not match the project drawing or existing control.

 

Never begin setting out until the coordinate system has been verified.

 

Step 2: Select the Base Location

 

Choose a stable location with:

 

Clear sky visibility

 

Minimal obstruction from trees and buildings

 

Low risk of disturbance

 

Safe distance from construction activities

 

Suitable radio coverage

 

Stable tripod footing

 

Sufficient elevation where practical

 

Avoid positioning the Base beside large metal structures, reflective walls, operating machinery or high-voltage equipment where possible.

 

The Base should remain undisturbed throughout the survey.

 

Step 3: Set Up and Level the Base

 

Install the TBase securely on the tripod or selected mounting system.

 

Depending on the project procedure:

 

Centre the receiver over the control point

 

Level the setup

 

Measure the antenna or instrument height

 

Enter the height correctly

 

Confirm the correct measurement reference

 

Record the setup information

 

Errors in Base centring or height can affect the resulting coordinates.

 

Step 4: Enter the Base Coordinates

 

The Base can be established using different methods.

 

Known-Point Setup

 

Enter the verified coordinates of an existing control point.

 

This is normally preferred when the project must match an established coordinate system.

 

Averaged Autonomous Position

 

Allow the receiver to calculate an average position.

 

This may be suitable for certain relative surveys, but the complete project can be shifted if the calculated Base coordinate does not match the required grid.

 

Previously Surveyed Point

 

Use coordinates established through an appropriate static, network or control-transfer procedure.

 

Whichever method is selected, verify the Base coordinates before starting Rover work.

 

An incorrect Base position can shift every measured and set-out point.

 

Step 5: Configure the UHF Radio

 

Set the TBase and Rover to matching communication parameters.

 

These may include:

 

Frequency

 

Protocol

 

Air baud rate

 

Channel

 

Correction-data format

 

Base identification

 

Radio power

 

The TBase supports 1W, 2W and 5W radio power.

 

Use only the power required for the project and confirm that the selected frequency and configuration comply with Malaysian requirements.

 

Higher power does not automatically guarantee better performance. Antenna height, terrain and line of sight are also important.

 

Step 6: Configure the Rover

 

Switch the T50 or T10 Pro to Rover mode and confirm:

 

Correct project file

 

Correct coordinate system

 

Matching radio settings

 

Suitable antenna type

 

Correct pole height

 

Incoming correction data

 

Satellite tracking

 

RTK solution status

 

IMU initialization where required

 

Do not record critical points until the system reaches the required fixed solution.

 

Step 7: Check a Known Point

 

Before beginning the survey, measure an independent known point.

 

Compare:

 

Easting

 

Northing

 

Elevation

 

Horizontal difference

 

Vertical difference

 

If the result is outside the project tolerance, stop and check:

 

Base coordinates

 

Coordinate system

 

Base and Rover antenna heights

 

Radio correction source

 

Pole height

 

Fixed or float status

 

Site-calibration parameters

 

This check can prevent an entire day of shifted measurements.

 

Step 8: Begin Survey or Setting Out

 

Once the known-point check is acceptable, proceed with the required work.

 

Possible applications include:

 

Topographic data collection

 

Building-grid setting out

 

Road alignment

 

Drainage positioning

 

Utility survey

 

Earthwork progress measurement

 

Infrastructure construction

 

Control-point transfer

 

Continue monitoring the RTK status throughout the work.

 

TBase Radio-Range Considerations

 

The official specification provides the radio frequency and power but does not state one guaranteed operating distance.

 

Actual UHF performance depends on:

 

Base antenna height

 

Rover antenna position

 

Hills and changes in elevation

 

Buildings

 

Trees and vegetation

 

Radio interference

 

Selected transmission power

 

Frequency and protocol

 

Receiver compatibility

 

Weather and site conditions

 

If radio communication is weak:

 

Raise the Base antenna

 

Improve line of sight

 

Move away from obstructions

 

Check antenna connections

 

Confirm matching settings

 

Test another permitted channel

 

Use an appropriate network workflow where available

 

UHF Base and Rover vs Network RTK

 

Choose a Local TBase System When:

 

Mobile coverage is weak

 

The site is remote

 

Independent correction is required

 

The project covers a defined working area

 

The team wants direct control of the Base coordinates

 

Choose Network RTK When:

 

Stable mobile data is available

 

A reliable correction service covers the project area

 

Fast setup is more important

 

Installing a local Base is inconvenient

 

The project procedures accept network corrections

 

Some teams use both methods and select the correction source according to the site.

 

Common Setup Mistakes

 

Incorrect Base Coordinates

 

This shifts every Rover measurement.

 

Wrong Coordinate System

 

The data may not match the project drawings or existing control network.

 

Incorrect Antenna Height

 

Affects elevation and potentially other calculated results.

 

Base Movement

 

A disturbed tripod changes the reference position during the survey.

 

Mismatched Radio Settings

 

The Rover may not receive correction data even though both receivers are operating.

 

Recording Float Measurements

 

A float solution may not provide the accuracy required for detailed survey or setting out.

 

No Independent Check

 

Without checking a known point, systematic setup errors may remain undetected.

 

End-of-Day Procedure

 

Before leaving the site:

 

Recheck a known point

 

Save and back up the project data

 

Export the required formats

 

Record the Base coordinates

 

Record antenna and pole heights

 

Save the radio settings

 

Power down the equipment correctly

 

Inspect and clean the receivers

 

Recharge all batteries

 

Maintaining a clear field record makes it easier to continue the project using the same control and configuration.

 

TOKNAV Base and Rover RTK Supplier in Malaysia

 

Contact MTM Precision for the TOKNAV TBase, T50 and T10 Pro, including Base and Rover configuration, quotation, demonstration and technical discussion in Malaysia.

 

MTM Precision Sdn. Bhd. (744811-A)

 

Telephone: +603-8080 7172

WhatsApp: +6016-660 7346

Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my

Website: www.mtmpre.com.my

 

Showroom & Service Centre:

No. 29-1 & 29-2, Jalan Bandar 18,

Pusat Bandar Puchong,

47160 Puchong, Selangor, Malaysia.


 

18 Sep 2026