How to Request an ABS Flood Barrier Project Quotation Malaysia
An accurate flood barrier quotation requires more than the total entrance width. Site photographs, floor condition, water direction and the number of protected openings can all affect the estimated panel quantity.
Providing complete information allows MTM Precision to prepare a faster and more relevant quotation for a **modular ABS flood barrier project in Malaysia**.
Quick Product Summary
• ABS construction
• Approximate size: 70.5 × 68 × 52 cm per panel
• Approximate weight: 2.8 kg per panel
• L-shaped self-supporting structure
• Modular interlocking connections
• Sealing and anti-slip strips
• Reusable after cleaning and inspection
• Ready stock in Malaysia
• Suitable for individual and bulk orders
1. Provide the Entrance Width
Measure the complete water-entry path from the intended starting point to the final endpoint.
Do not measure only:
• The moving section of a glass door
• The roller shutter
• The driveway lane
• The gate opening
Include side gaps, wall corners and any extra coverage required to reduce water flowing around the ends.
2. Send Clear Site Photographs
Provide photographs showing:
• The complete entrance
• Ground condition
• Left and right sides
• Nearby drains
• The surrounding road or driveway
• Expected direction of incoming water
• Any slope, step or kerb
• Alternative water-entry routes
A short video may also help explain a wide or complicated entrance.
3. Share Previous Flood Information
If available, provide:
• Previous maximum water level
• Watermarks
• Photographs or CCTV footage
• Speed at which water rose
• Direction of flow
• Duration of flooding
• Whether debris was present
• Areas damaged during the incident
This information helps determine whether a temporary modular barrier appears appropriate.
4. List Every Protected Entrance
For a commercial or multi-site project, prepare an entrance schedule.
| Site | Entrance | Width | Quantity Estimate | Priority |
|---|---|---:|---:|---|
| Building A | Main lobby | Measure on site | To be estimated | High |
| Building A | Loading bay | Measure on site | To be estimated | High |
| Building B | Storeroom | Measure on site | To be estimated | Medium |
| Building B | Electrical room | Measure on site | To be estimated | Critical |
Use a separate reference name for each entrance so that the quotation and delivery quantities remain clear.
5. Preliminary Panel Estimate
| Approximate Entrance Width | Initial Quantity Estimate |
|---|---:|
| 1 metre | 2 panels |
| 2 metres | 3–4 panels |
| 3 metres | 5 panels |
| 4 metres | 6–7 panels |
| 5 metres | 8 panels |
| 7 metres | 10–11 panels |
| 10 metres | 15–16 panels |
These quantities are preliminary because connected panels overlap. Additional panels may be required for side coverage, corners, backup or changes to the layout.
6. Provide Company Information
For a formal quotation, include:
• Company name
• Billing address
• Delivery address
• Contact person
• Telephone number
• Email address
• Project name or reference
• Required delivery date
• Required quantity
Inform MTM Precision if the quotation needs to follow a particular procurement format.
7. Confirm the Delivery Location
The quotation may depend on:
• State and postcode
• Commercial or residential delivery
• Site-access conditions
• Quantity ordered
• Required delivery schedule
• Whether the order is divided between several locations
For multi-location orders, provide the quantity and complete address for each destination.
8. Identify the Intended Application
State whether the panels are intended for:
• Shoplot entrance
• Warehouse
• Factory
• Loading bay
• Residential gate
• Office building
• Car park
• Electrical room
• School or clinic
• Property-management project
Different applications may require different questions before the quantity can be estimated.
9. Check Storage and Deployment
Before confirming the order, decide:
• Where the panels will be stored
• Who will install them
• How the panels will reach the entrance
• Which access route will remain open
• Whether spare panels are required
• Whether pumps and seepage equipment are available
• When deployment will begin
A system that cannot be reached or installed quickly during heavy rain may not provide practical protection.
10. Understand the Product Limitations
The physical panel height is approximately **52 cm**, but this is not a guaranteed safe water-retention depth.
Performance depends on:
• Water depth and speed
• Floating debris
• Ground condition
• Panel orientation
• Secure connections
• Side coverage
• Drainage capacity
• Timely deployment
Photographs and measurements can support an initial product estimate, but they do not replace professional engineering or flood-risk assessment for a high-risk site.
Frequently Asked Questions
Can I request a quotation using only the entrance width?
Yes, but the result will be preliminary. Photographs and site details allow a better initial estimate.
Can MTM confirm the exact number of panels remotely?
MTM can provide an initial estimate. Connection overlap, floor condition and actual installation layout may affect the final quantity.
Can I request pricing for several branches?
Yes. Submit a separate entrance schedule and delivery address for each branch.
Can contractors request bulk pricing?
Yes. Provide the project name, total quantity, entrance schedule and required delivery date.
Can I visit the Puchong showroom?
Contact MTM Precision before visiting to confirm current availability and arrangements.
Send Your Quotation Request
For a faster response, send:
• Entrance width
• Site photographs or video
• Previous flood level
• Expected water direction
• Required quantity
• Company details
• Delivery location
• Required delivery date
MTM Precision can prepare an initial panel estimate and quotation for residential, commercial and project requirements in Malaysia.
**MTM Precision Sdn Bhd**
**Showroom & Service Centre:** No. 29-1 & 29-2, Jalan Bandar 18, Pusat Bandar Puchong, 47160 Puchong, Selangor, Malaysia
**Tel:** 03-8080 7172
**WhatsApp:** +6016-660 7346
**Email:** mtmpre@yahoo.com
**Website:** www.mtmpre.com.my
22 Sep 2026