Power Quality Diagnostics & Electrical Safety Protection: PEAKMETER MS2205 Harmonic Power Clamp Meter & MS5909 Leakage Switch Tester in Malaysia
Power Quality Diagnostics & Electrical Safety Protection: PEAKMETER MS2205 Harmonic Power Clamp Meter & MS5909 Leakage Switch Tester in Malaysia
Diagnosing Energy Efficiency & Harmonic Distortion with the PEAKMETER MS2205
-
Complete Power & Energy Visibility: Capable of clamping around large industrial conductors with its generous 50mm jaw opening, the MS2205 measures AC Current up to 1000A, AC Voltage up to 600V,Single-Phase and Three-Phase Active Power up to 600kW, Reactive Power up to 600kVAr, and Power Factor (0.3 to 1). This allows facility teams to audit motor loads, identify phase imbalances, and spot power factor penalties before they impact utility costs.
-
In-Depth Harmonic Analysis (Up to the 20th Order): Equipped with True RMS measurement across a 45Hz–65Hz fundamental frequency, the MS2205 analyzes harmonic components from Harmonic No. 1 all the way through Harmonic No. 20. Maintenance engineers can immediately pinpoint whether distorted currents are stressing neutral conductors, transformers, or sensitive automation controls.
-
Built for Field Logging & PC Reporting: Featuring a crisp 6000-count backlit display, Data Hold,Auto Ranging, on-board data logging and recall for up to 100 groups, and an RS232 interface for transferring captured measurements to a computer, the MS2205 streamlines energy audits and preventive maintenance documentation.
-
Industrial Safety Compliance: Built to meet EN61010-1, EN61010-2-032, and EN61326 standards with a CAT III 600V safety rating and CE/RoHS compliance, it delivers reliable, rugged performance powered by four standard 1.5V AA batteries.
Verifying Life-Saving RCD Protection with the PEAKMETER MS5909
-
Universal Single-Phase & Three-Phase Compatibility: Unlike basic socket testers limited to single-phase outlets, the MS5909 supports Single-Phase (180V–264V) two-wire and three-wire systems as well as Three-Phase (360V–440V) three-wire and four-wire systems—making it ideal for commercial main switchboards, factory machinery panels, and residential distribution boxes alike.
-
Comprehensive Trip-Time & Ramp-Current Testing: Covering standard rated residual operating currents of 10mA, 20mA, 30mA, 100mA, 200mA, 300mA, and 500mA, the MS5909 performs x1/2 non-trip verification, x1, x2, and x5 fast-trip timing tests, and Auto Ramp slope testing (stepping from 40% to 110% of rated leakage current) to pinpoint the exact current level and response time at which a breaker trips. Selectable 0° and 180° phase angles ensure worst-case half-cycle testing accuracy.
-
Built-In Safety Safeguards & Wiring Diagnostics: Before injecting any test current, the MS5909 performs automatic wiring inspection, AC voltage measurement (30V–440V), fault voltage (Uf) detection, and over-temperature protection—preventing hazardous touch voltages from developing on protective earth conductors during testing.
-
Efficient Field Workflow: Housed in a shock-resistant protective casing with a large backlit LCD, storage for up to 99 sets of test data, low battery detection, and auto shutdown, the MS5909 simplifies compliance testing and periodic safety certification across Malaysia.
Elevate Electrical Maintenance & Safety Compliance in Malaysia
16 Nov 2026