Why Do Plastic Concrete Cube Moulds Crack? Common Causes & Prevention Malaysia
Why Do Plastic Concrete Cube Moulds Crack? Common Causes & Prevention Malaysia
Introduction
Plastic Concrete Cube Moulds are popular with contractors, ready-mix concrete companies, precast manufacturers, and testing teams because they are lightweight, corrosion resistant, and convenient to transport.
However, like any working equipment, a Plastic Cube Mould can become damaged.
One of the most common questions from users is:
“Why did my Plastic Cube Mould crack?”
There is rarely only one possible cause.
Cracking may be related to:
Rough demoulding
Dropping or impact
Incorrect cleaning
Poor transportation
Heavy stacking
Repeated working cycles
Storage conditions
Understanding where damage occurs can help companies reduce unnecessary replacement and improve the working life of their mould inventory.
At MTM Precision Sdn. Bhd., we supply Plastic and Cast Iron Concrete Cube Moulds for concrete testing applications throughout Malaysia.
Plastic Cube Moulds Are Reusable, but Not Indestructible
A Plastic Cube Mould is designed for repeated specimen preparation.
However, “reusable” does not mean:
Impossible to break.
During its working life, a mould may repeatedly go through:
Transport → Preparation → Concrete Casting → Demoulding → Cleaning → Inspection → Storage → Reuse
Damage can occur at any stage of this cycle.
Cause 1 – Dropping the Mould
One of the simplest causes of damage is impact.
A mould may be dropped:
From a workbench
From a vehicle
During unloading
While carrying several moulds
During cleaning
One drop may not necessarily cause visible damage, but repeated impacts can increase the risk of cracking.
Cause 2 – Throwing Moulds After Use
On busy construction sites, technicians may need to process many specimens quickly.
After demoulding, moulds can sometimes be thrown into a pile.
This saves a few seconds but increases unnecessary impact.
A better approach is to place used moulds into a designated cleaning or return area.
Cause 3 – Excessive Force During Demoulding
Demoulding is another stage where damage can occur.
If a specimen is difficult to remove, the immediate reaction may be:
Hit it harder.
That is not always the right solution.
Repeated excessive impact can damage:
Walls
Corners
Base areas
Demoulding features
Use the appropriate demoulding procedure for the mould design.
Cause 4 – Using a Hammer Aggressively
Plastic and metal behave differently.
A technique that may appear acceptable for heavy steel equipment can be inappropriate for a Plastic Cube Mould.
Aggressive hammering can create localised impact stress and eventually contribute to cracking.
If excessive force is regularly required, investigate the reason.
Cause 5 – Using Sharp Tools to Remove Concrete
Concrete residue can become difficult to remove after hardening.
Technicians may then use:
Screwdrivers
Chisels
Sharp scrapers
Other metal tools
Aggressive scraping can damage Plastic Cube Mould surfaces.
Regular cleaning before residue becomes heavily hardened is a better approach.
Cause 6 – Concrete Is Allowed to Build Up
Poor cleaning can indirectly lead to mould damage.
The cycle may look like this:
Concrete Residue Left Behind
↓
Residue Hardens
↓
Cleaning Becomes Difficult
↓
Technician Uses More Force
↓
Mould Is Scratched or Damaged
Good maintenance can prevent this cycle.
Cause 7 – Heavy Equipment Is Stacked on Top
Plastic Cube Moulds should not be treated as structural storage supports.
Avoid stacking heavy equipment such as:
Cast Iron Moulds
Toolboxes
Steel components
Machine parts
Construction materials
on top of them.
Excessive loading can potentially contribute to deformation or damage.
Cause 8 – Poor Vehicle Storage
Ready-mix QC teams and contractors often transport Plastic Cube Moulds in vehicles.
The moulds may share space with:
Slump Cone
Tamping Rod
Base Plate
Toolboxes
Hand tools
Other testing equipment
If everything is loose, equipment can repeatedly collide while the vehicle is moving.
Over time, this can cause unnecessary damage.
Cause 9 – Moulds Move Around During Braking
A Cube Mould does not need to fall from a building to experience impact.
Imagine a mould sliding across the back of a van every time the driver brakes.
That can happen many times during one working day.
Organising or securing equipment in the vehicle can reduce repeated impact.
Cause 10 – Incorrect Stacking
Plastic Cube Moulds are convenient to store in quantity, but stacking should be sensible.
Do not create unstable piles that can:
Fall
Collapse
Put excessive pressure on lower moulds
The storage method should suit the particular mould design.
Cause 11 – Rough Handling by Multiple Teams
Equipment used by one trained technician may be handled consistently.
Equipment shared by many teams may not be.
For example:
Team A handles moulds carefully.
Team B throws them into the truck.
Team C uses a screwdriver for cleaning.
The company may then experience inconsistent mould life.
Basic handling instructions can help.
Cause 12 – Using the Mould for Other Purposes
Plastic Cube Moulds look like convenient small containers.
This can tempt workers to use them for:
Bolts
Nails
Tools
Steel parts
Construction materials
This can damage internal specimen-forming surfaces and increase the chance of impact damage.
Keep Cube Moulds for their intended testing application.
Cause 13 – Natural Wear from Frequent Use
Not every crack means somebody did something wrong.
A mould used frequently experiences repeated:
Filling
Compaction
Demoulding
Cleaning
Carrying
Storage
Over time, working equipment can require replacement.
The important thing is to distinguish normal replacement from unusually high damage rates.
Where Should You Inspect for Cracks?
After cleaning, inspect:
Side walls
Bottom corners
Upper edges
Internal corners
Base area
Reinforced sections
Demoulding features
Some cracks can be easier to see when the mould is clean.
Small Cracks Should Not Automatically Be Ignored
A user may see a small crack and think:
“It still holds concrete, so it's okay.”
That is not necessarily sufficient.
A crack may potentially affect:
Rigidity
Geometry
Leakage
Future durability
Questionable moulds should be inspected according to the applicable quality procedure before returning to service.
Don't Wait for the Crack to Become Large
A small problem is easier to identify when moulds are inspected regularly.
If damaged moulds remain in daily circulation, technicians may continue applying force to them until the damage becomes much worse.
A simple:
READY / HOLD / REPLACE
system can prevent this.
Can a Cracked Plastic Cube Mould Be Repaired?
Users may attempt to repair cracks with:
Glue
Adhesive
Sealant
Plastic welding
Tape
But closing a visible crack does not automatically prove that the mould remains dimensionally suitable.
For concrete testing applications, technical suitability should be considered before putting a repaired mould back into service.
Replacement May Be More Practical
Plastic Cube Moulds are relatively compact working equipment.
If a mould is seriously cracked or distorted, replacement may sometimes be more practical than repeated repair attempts.
This is especially true for companies that keep spare stock available.
How Can You Reduce Plastic Cube Mould Damage?
A practical damage-reduction programme can be very simple.
Step 1 – Handle Carefully
Avoid dropping and throwing.
Step 2 – Demould Correctly
Avoid uncontrolled excessive force.
Step 3 – Clean Promptly
Do not allow heavy concrete build-up.
Step 4 – Store Properly
Avoid heavy loads and unstable piles.
Step 5 – Transport Properly
Prevent moulds from repeatedly colliding with heavy equipment.
Step 6 – Inspect Regularly
Remove questionable units from circulation.
These basic steps can make a meaningful difference.
Train New Technicians
Experienced concrete technicians may already know how to handle Cube Moulds.
New workers may not.
A short training session can cover:
Correct mould handling
Demoulding method
Cleaning
Storage
Damage reporting
This can be particularly useful for ready-mix companies with multiple QC teams.
Record Why Moulds Are Replaced
If your company uses large quantities of Plastic Cube Moulds, record the reason for replacement.
For example:
Replacement ReasonQuantityCracked During Handling5Vehicle Damage3Distortion2Lost at Site4Normal Wear / Condition6
After several months, patterns may become obvious.
High Crack Rate? Investigate the Process
Suppose a company buys 100 Plastic Cube Moulds and 25 crack within a short period.
Instead of immediately concluding:
“Plastic moulds don't last.”
investigate:
Which teams are using them?
Where are cracks appearing?
How are specimens demoulded?
How are moulds transported?
How are they cleaned?
How are they stored?
The cause may be operational rather than simply material-related.
Compare Damage Between Teams
For a large ready-mix operation, identification can provide useful information.
For example:
QC Vehicle A – Low Damage
QC Vehicle B – High Damage
If both teams use the same mould model, the difference may point to handling or storage practices.
This is valuable information for management.
Keep Spare Plastic Cube Moulds
Even with good handling, replacement will eventually be required.
Frequent users should consider keeping spare stock.
For example:
Operational Stock
plus
Replacement / Spare Stock
When one mould is removed, another can immediately enter circulation.
Set a Reorder Level
Do not wait until all spare moulds are used.
A ready-mix plant or contractor can establish an internal minimum.
For example:
Target Spare Stock: 20 Units
When spare stock drops below the target, purchasing reviews the replacement requirement.
The actual quantity should reflect the company's workload.
Plastic Cube Moulds Remain Practical for Site Use
The possibility of cracking does not remove the major advantages of Plastic Cube Moulds.
For many site users, they remain attractive because they are:
Lightweight
Portable
Corrosion resistant
Easy to keep in quantity
Convenient for mobile testing
The key is to handle them as testing equipment, not as disposable containers.
When Should You Consider Cast Iron Instead?
If the mould will remain permanently in a laboratory and portability is not important, Cast Iron Cube Moulds may be worth considering.
Cast Iron offers high rigidity but introduces different maintenance considerations such as:
Corrosion
Fasteners
Joints
Higher handling weight
Neither material is maintenance-free.
Some Companies Should Use Both
A practical arrangement can be:
Plastic Cube Mould → Site / Mobile QC
Cast Iron Cube Mould → Permanent Laboratory
This allows each material to be used where its strengths are most useful.
Plastic Cube Mould + Slump Cone for Mobile QC
For ready-mix and contractor teams, Plastic Cube Moulds can form part of a compact site-testing equipment set.
A typical setup may include:
Plastic Concrete Cube Moulds
Slump Cone
Tamping Rod
Base Plate
Measuring Accessories
These products can travel together with the QC technician.
Check Slump Cone Condition at the Same Time
If your company is already conducting a periodic equipment inspection, do not check only Cube Moulds.
Inspect related site-testing equipment as well.
For example:
Cube Mould – Condition?
Slump Cone – Condition?
Tamping Rod – Available?
Base Plate – Available?
This can help ensure the complete site-testing set remains ready.
Need Replacement Plastic Cube Moulds?
MTM Precision supplies:
Plastic Concrete Cube Moulds
Cast Iron Concrete Cube Moulds
100mm Cube Moulds
150mm Cube Moulds
We support:
First-time purchases
Bulk quantities
Replacement moulds
Spare stock
Repeat orders
For quotation, provide:
Mould Type: Plastic / Cast Iron
Size: Required Size
Quantity: Required Units
Application: Contractor / Ready-Mix / Precast / Laboratory
Required Specification: If applicable
Why Choose MTM Precision?
MTM Precision supplies practical Concrete Testing Equipment for customers throughout Malaysia.
Our key compact product categories include:
Concrete Cube Mould
Slump Cone
Concrete Test Hammer
We support contractors, ready-mix companies, precast manufacturers, laboratories, universities, and QA/QC teams with new purchases and repeat replacement requirements.
Contact MTM Precision
MTM Precision Sdn. Bhd.
Showroom & Service Centre
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia
Website: www.mtmpre.com.my
Email: mtmpre@yahoo.com
WhatsApp: +6016-660 7346
SEO Keywords
Why Plastic Concrete Cube Mould Cracks, Plastic Cube Mould Damage Malaysia, Plastic Concrete Cube Mould Maintenance Malaysia, Plastic Cube Mould Replacement Malaysia, Concrete Cube Mould Supplier Malaysia, 100mm Plastic Cube Mould Malaysia, 150mm Plastic Cube Mould Malaysia, Ready Mix Cube Mould Malaysia, Concrete Testing Equipment Malaysia, Slump Cone Malaysia.
14 Aug 2026