Myzox Monitoring Prism for Building Settlement and Displacement Monitoring Malaysia
Myzox Monitoring Prism for Building Settlement and Displacement Monitoring
Construction projects located close to existing buildings may require systematic monitoring to identify changes in the position of selected structural points.
The Myzox TK-10S / TK-10 Monitoring Prism L-Bar Type provides a fixed reflective target for repeated total station measurements and can support building displacement and deformation monitoring applications in Malaysia.
Once installed at predetermined locations, the prisms remain as defined survey targets that can be observed repeatedly throughout different stages of a project.
MTM Precision Sdn. Bhd. is an authorized distributor of Myzox in Malaysia.
What Is Building Settlement and Displacement Monitoring?
Building monitoring can involve observing changes in both horizontal and vertical position.
Depending on the project and measurement method, engineers and surveyors may be interested in:
Horizontal displacement
Lateral movement
Vertical displacement
Changes in elevation
Structural deformation
Differential movement between monitoring points
Three-dimensional positional changes
Dedicated levelling techniques may be used where precise settlement measurement is required, while total station prism monitoring can provide positional information as part of a broader deformation monitoring program.
Why Are Existing Buildings Monitored?
Monitoring may be specified when construction activities have the potential to affect nearby structures.
Typical situations include:
Deep excavation
Basement construction
Piling works
Foundation construction
Tunnelling
MRT and railway construction
Road and highway works
Adjacent demolition
Major infrastructure projects
High-rise construction
Baseline measurements taken before major works begin provide reference data for future comparisons.
How Does Myzox Monitoring Prism Work?
The monitoring prism is securely mounted at a predetermined location on the structure.
A total station measures the prism's position.
The process can then be repeated throughout the monitoring period.
A simplified workflow is:
Install Prism → Establish Survey Control → Baseline Observation → Start Construction → Repeat Measurements → Compare Results
Because the prism remains fixed, surveyors can repeatedly observe the same physical target.
Myzox TK-10S / TK-10 Specifications
SpecificationDetailsModelsTK-10S / TK-10Product TypeMonitoring Prism L-Bar TypePrism Diameter1 inch / 25 mmPrism Constant-25 mmPrism Height60 mmBeam Deviation5″DimensionsH90 × W86.5 × D30 mmWeightApprox. 207 gAdjustmentX/Y direction
Its compact design makes it suitable for monitoring locations where installing a conventional full-size prism assembly may be impractical.
Where Can Prisms Be Installed on a Building?
The exact monitoring positions should be determined by the responsible project professionals.
Depending on the monitoring design, potential locations may include:
Building façades
Structural columns
Concrete walls
Selected structural elements
Perimeter structures
Areas facing the excavation
Other predetermined monitoring points
The selected location should also provide suitable visibility from the total station observation position.
Establishing Baseline Measurements
Monitoring normally begins by establishing initial reference measurements.
For example:
Monitoring Point MP01
Baseline → Observation 1
Monitoring Point MP02
Baseline → Observation 1
Monitoring Point MP03
Baseline → Observation 1
These initial positions become reference data for subsequent measurement campaigns.
Whenever practical, baseline measurements should be collected before activities that may influence the monitored structure begin.
Monitoring Throughout Construction
Once construction starts, observations can be repeated according to the project schedule.
For example:
Pre-Construction Baseline
↓
Piling Stage
↓
Excavation Stage 1
↓
Excavation Stage 2
↓
Final Excavation Level
↓
Basement Construction
↓
Superstructure Construction
↓
Post-Construction Monitoring
This creates a chronological measurement record for the installed monitoring points.
Can a Monitoring Prism Measure Settlement?
A prism itself does not directly measure settlement.
It provides a reflective target for the total station.
Depending on the survey design, total station observations may provide elevation information that can be compared over time.
However, where a project requires high-precision settlement measurement, dedicated precise levelling or other appropriate instrumentation may also be specified.
The monitoring method should match the project's required accuracy and engineering objectives.
Horizontal Displacement Monitoring
Prism-based total station monitoring is particularly useful for observing positional changes.
Coordinates from different observation periods can be compared to evaluate horizontal displacement.
For example:
Baseline Coordinate → Current Coordinate → Difference
When multiple prisms are installed, the survey team can compare movement patterns across different areas of the structure.
Why Use Multiple Monitoring Prisms?
One prism provides information about one selected location.
A larger structure may require several monitoring points.
For example:
MP01 — MP02 — MP03 — MP04 — MP05
Using multiple targets can help provide a broader picture of positional changes across the monitored structure.
The quantity and distribution of targets should follow the project's monitoring design.
Monitoring Prism vs Crack Gauge
Monitoring prisms and crack gauges measure different things.
Monitoring Prism
Used with a total station to monitor the position of selected survey points.
Crack Gauge
Used to observe changes in the width or relative movement of a specific crack or joint.
For some structural monitoring projects, both methods may be used because they provide different types of information.
Monitoring Prism vs Settlement Marker
These are also different monitoring tools.
A monitoring prism is an optical target for total station observations.
Settlement markers or benchmarks may be used with levelling equipment to monitor elevation changes.
The project engineer or surveyor should determine which combination of monitoring methods is appropriate.
Why Is the -25 mm Prism Constant Important?
The Myzox TK-10S / TK-10 has a specified prism constant of -25 mm.
The correct prism constant should be configured on the total station according to the instrument manufacturer's procedures.
Using incorrect prism settings can introduce systematic distance offsets.
For repeated monitoring work, maintaining consistent prism and instrument settings is particularly important.
Importance of Prism Orientation
A fixed prism should be properly oriented toward the intended observation position.
The Myzox TK-10S / TK-10 provides X/Y directional adjustment, allowing the prism orientation to be adjusted during installation.
This is useful when the mounting surface does not naturally face the total station.
Protecting Long-Term Monitoring Points
Monitoring targets may remain installed for weeks, months or longer.
During this period, they should be protected from accidental disturbance whenever possible.
The Myzox monitoring prism incorporates features including:
Anti-drop structure
Waterproof sealing design
Compact fixed configuration
Monitoring teams should still inspect the targets periodically.
If a prism has been hit, loosened, rotated or otherwise disturbed, the monitoring data should be reviewed carefully before comparing it with earlier observations.
Total Station Calibration for Deformation Monitoring
Reliable monitoring requires more than good prisms.
The total station should also be appropriately maintained and checked.
Factors such as instrument condition, survey control, observation geometry and field procedure all influence measurement quality.
MTM Precision provides total station calibration and surveying instrument service in Malaysia for professional survey and construction applications.
Who Uses Monitoring Prisms?
Myzox monitoring prisms are relevant to:
Land surveyors
Engineering surveyors
Civil engineering contractors
Structural consultants
Geotechnical consultants
Construction companies
Infrastructure contractors
Monitoring specialists
They are particularly useful for companies carrying out repeated deformation surveys.
Myzox Monitoring Prism Supplier in Malaysia
MTM Precision supplies Myzox monitoring prisms, total station accessories and professional surveying equipment in Malaysia.
The TK-10S / TK-10 can support building displacement, structural deformation, excavation, retaining wall, bridge and slope monitoring applications.
Contact MTM Precision
MTM Precision Sdn. Bhd.
Myzox Authorized Distributor in Malaysia
Showroom & Service Centre
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
Website: www.mtmpre.com.my
Email: mtmpre@yahoo.com
WhatsApp: +6016-6607346
Contact MTM Precision for Myzox TK-10S / TK-10 Monitoring Prism price, availability and technical enquiries in Malaysia.
18 Aug 2026