TOKNAV RTK Daily Field Check and Maintenance Malaysia
TOKNAV RTK Daily Field Check and Maintenance Malaysia
A daily inspection helps reduce avoidable RTK errors, equipment downtime and lost field data when using the TOKNAV T50, T10 Pro, TBase and PCR100T.
The receiver may appear physically normal while an incorrect project file, damaged antenna, loose pole or expired correction account affects the work.
A complete check should cover:
Equipment condition
Battery capacity
Receiver configuration
RTK corrections
Coordinate system
Pole and antenna height
Known control
Field-data backup
Cleaning and storage
Why Is a Daily RTK Check Necessary?
RTK survey results depend on several connected components:
GNSS Base or network correction service
Rover receiver
Field controller
Survey software
Coordinate system
Control points
Radio or mobile connection
Survey pole
Operator procedure
A failure in one component can affect the entire survey.
Daily checks help identify problems before they affect:
Construction stakeout
Earthwork quantities
Topographic survey
Road alignment
Drainage levels
Utility positions
As-built records
Progress claims
TOKNAV Equipment Covered
This checklist is suitable for systems involving:
TOKNAV T50 green-laser RTK receiver
TOKNAV T10 Pro engineering RTK receiver
TOKNAV TBase GNSS Base station
TOKNAV PCR100T data controller
tSurvey field software
Base tripod and tribrach
Rover pole
UHF antennas
Chargers and communication accessories
The exact procedure should follow the supplied equipment and software configuration.
Before Leaving the Office
Check the Work Order
Confirm:
Project name
Site location
Scope of work
Required points
Accuracy requirement
Coordinate system
Control-point information
Latest drawing revision
Required output
Site contact
Safety requirements
Do not rely only on verbal instructions for important setting-out work.
Confirm the Equipment List
Prepare:
Base receiver where required
Rover receiver
Field controller
Rover pole
Base tripod
Tribrach or adapter
UHF antennas
Chargers
Power bank where approved
Communication cables
SIM card
Measuring tape
Field book
Control-point information
Carrying cases
Required safety equipment
Use a standard packing list to reduce missing accessories.
Battery Check
Charge all required equipment before deployment.
Check:
Rover battery
TBase battery
PCR100T battery
External power source
Chargers
Charging cables
Vehicle charger where approved
Relevant published battery information includes:
TOKNAV T10 Pro
9600mAh battery
More than 16 hours of typical Rover operation
TOKNAV T50
More than 16 hours in the stated network mode
TOKNAV TBase
13,800mAh battery
More than 12 hours of stated Base operation using the 5W radio
TOKNAV PCR100T
9000mAh battery
More than 18 hours of stated operation
Actual endurance depends on configuration, screen brightness, radio use, mobile data, temperature and battery condition.
Receiver Physical Inspection
Inspect the T50, T10 Pro and TBase for:
Cracked housing
Impact marks
Loose components
Damaged connectors
Missing port covers
Dirty charging contacts
Moisture
Damaged antenna threads
Loose mounting thread
Unusual sounds when moved
Do not use a receiver with suspected structural or water damage for critical work without inspection.
Check the T50 Laser Window
For the T50:
Inspect the laser window
Remove dust using an appropriate soft material
Check for scratches
Check for moisture or contamination
Confirm the laser path is unobstructed
Perform a short-range laser test
Do not use abrasive material or unauthorised cleaning chemicals.
Check UHF Antennas
Inspect Base and Rover radio antennas for:
Correct model
Secure connection
Cracked housing
Bent connector
Corrosion
Damaged cable
Incorrect adapter
Never operate the high-power Base radio without the correct antenna properly connected.
Inspect the Rover Pole
Check:
Pole straightness
Locking mechanism
Height graduations
Pointed tip
Thread connection
Pole bubble
Extension sections
Receiver adapter
A bent or loose pole can affect both conventional and IMU tilt measurements.
Inspect the Base Tripod
Check:
Tripod legs
Clamps
Feet
Head plate
Tribrach
Adapters
Screws
Stability
Replace or repair loose components before installing an unattended Base.
Controller Check
For the PCR100T, confirm:
Sufficient battery
Correct date and time
Available storage
Touchscreen operation
Physical keypad
Bluetooth
Wi-Fi
Mobile data
SIM card
Camera
Charging port
Controller holder
Delete unnecessary files only after confirming that project data is backed up.
Software and Licence Check
Before reaching the site, open tSurvey and verify:
Application launches correctly
Required licence is active
T50 laser function is available where required
AR stakeout is available where required
Correct receiver profile is installed
Required project files can be opened
Import and export functions work
No unexpected expiry warning appears
Do not wait until arriving at a remote site to discover that the software cannot open the project.
Project-File Check
Confirm:
Correct project name
Correct client or site
Latest localization
Latest design points
Correct CAD revision
Correct road or LandXML file
Required feature codes
Output format
Previous control-check record
Avoid unclear file names such as “New,” “Test,” “Final2” or “Latest.”
At the Site: Safety Check
Before setting up:
Complete the required site registration
Review the work area
Identify traffic
Identify excavations
Check overhead hazards
Check machinery movement
Select a safe Base position
Confirm permitted access
Use the required personal protective equipment
Equipment capability does not replace a site risk assessment.
TBase Setup Check
When using a local Base:
Select stable ground.
Confirm clear sky visibility.
Keep away from reflective structures.
Install the tripod securely.
Position over the correct control point.
Measure the Base antenna height.
Enter the approved Base coordinate.
Connect the correct UHF antenna.
Select the approved frequency and protocol.
Start Base transmission.
Record the setup.
Protect the Base from machinery and unauthorised movement.
Verify the Base Point
Confirm:
Physical point identification
Point name
Easting
Northing
Elevation
Datum
Coordinate source
Antenna height
Height type
Receiver reference point
Photographing the Base setup can help with later verification.
Base Movement Check
During the day, inspect whether the Base has:
Settled into soft ground
Been hit
Been moved
Lost power
Lost its antenna
Tilted
Been obstructed by parked vehicles
Been affected by construction activity
If the Base has moved, stop production work and assess the affected observations.
Network RTK Connection Check
When using CORS, VRS or NTRIP:
Confirm the SIM card
Check mobile data
Verify APN settings
Enter the correct server
Enter the correct port
Select the approved mountpoint
Confirm account status
Monitor incoming corrections
Check correction-data age
Confirm Fixed status
Do not share or display correction-service passwords unnecessarily.
Coordinate-System Check
Verify:
Datum
Projection
Zone
Geoid
Vertical datum
Units
Localization
Scale
Rotation
Project offsets
Do not assume the project remained unchanged since the previous site visit.
Pole-Height Check
Before measuring:
Read the physical pole graduation.
Lock the pole sections.
Confirm any adapter height.
Enter the height in tSurvey.
Confirm the unit.
Record any later height change.
A wrong pole height can affect every recorded elevation.
When IMU tilt is used, it may also affect the calculated horizontal pole-tip position.
Known-Point Check
Before production work:
Obtain stable Fixed status.
Place the pole on an approved independent control point.
Measure the point.
Compare easting.
Compare northing.
Compare elevation.
Repeat the observation.
Record the differences.
Confirm the result meets the project tolerance.
Fixed status alone is not a substitute for this check.
Daily Control-Check Record
ItemResultProjectDate and timeReceiverCorrection sourceControl pointAccepted EastingMeasured EastingAccepted NorthingMeasured NorthingAccepted ElevationMeasured ElevationRTK statusCorrection agePole heightOperatorRemarks
This record is useful if a coordinate discrepancy is discovered later.
IMU Tilt Check
Before relying on IMU tilt:
Obtain stable Fixed status
Confirm the pole height
Initialize the IMU
Check the ready indicator
Measure a point vertically
Measure the same point while tilted
Compare the results
Keep the pole tip fixed
Repeat the test after a receiver restart, impact or unusual IMU warning.
T50 Laser Check
Before using the green laser:
Select a stable short-range target.
Confirm that the target can also be measured directly.
Obtain stable Fixed status.
Measure the target with the pole.
Measure the same target using the laser.
Repeat the laser observation.
Compare the coordinates.
Record the conditions.
The published laser 3D positioning error is ≤2.5cm within 5m under the specified conditions.
Do not assume identical accuracy at every distance up to the stated maximum range.
AR Stakeout Check
Before using AR stakeout:
Confirm tSurvey 2.0 activation
Check the controller camera
Import the correct design file
Verify the selected point
Confirm the coordinate system
Test the direction guidance
Use numerical offsets for final positioning
AR helps guide the operator but does not independently determine the final coordinate.
During the Survey
Monitor:
Fixed, Float or Single status
Correction-data age
Satellite environment
Pole height
IMU status
Base battery
Rover battery
Controller battery
Mobile coverage
UHF reception
Point codes
Design revision
Equipment condition
Stop and investigate any unexplained change.
Surveying Near Buildings and Trees
Watch for:
Fixed-to-Float changes
Multipath
Unstable elevation
Slow initialization
Inconsistent repeated observations
Poor correction reception
Where GNSS conditions are unsuitable:
Move to a clearer position
Use an offset
Use IMU tilt where appropriate
Use T50 laser measurement where suitable
Use a Total Station
Do not store questionable points only because coordinates are displayed.
Point-Code and Description Check
Use consistent field codes for features such as:
Ground
Drain
Manhole
Road edge
Top of bank
Bottom of bank
Wall
Fence
Tree
Building corner
Clear coding reduces office interpretation errors.
Record whether a point was measured by:
Vertical pole
IMU tilt
T50 green laser
Offset method
Midday Control Check
For important or long-duration work, remeasure a known control point during the day.
A midday check may detect:
Base movement
Wrong project loaded
Changed pole height
Correction-source change
Localization problem
Equipment impact
Unexpected coordinate shift
Do not wait until the end of the project to discover a systematic error.
Weather Considerations
Rain
Keep protective covers closed
Wipe water from connectors
Watch for slippery pole placement
Protect the controller screen
Inspect equipment before charging
Heat
Avoid leaving equipment in a closed hot vehicle
Monitor battery temperature
Protect the screen from prolonged direct sunlight
Allow ventilation according to manufacturer guidance
Lightning
Stop work and follow site safety procedures.
A survey pole, tripod and antenna should not be used in an unsafe lightning environment.
End-of-Day Control Check
Before dismantling the Base or leaving the site:
Measure an independent control point.
Compare it with the morning check.
Record the result.
Investigate any unexpected difference.
Identify which observations may be affected.
This provides evidence that the system remained consistent during the survey session.
Data Backup
At the end of work:
Save the project
Export raw observations
Export required coordinate files
Back up CAD or road data
Preserve localization files
Store control-check records
Keep photographs
Copy data to an approved second location
Confirm that the exported file opens correctly
Do not erase the controller project immediately after export.
File-Naming Method
Use a clear method such as:
Project – Survey Type – Date – Revision
Examples:
SiteA-Topo-20260918-R1
RoadB-Stakeout-20260918-R2
FactoryC-AsBuilt-20260918-R1
Avoid overwriting the only copy of the previous day’s work.
Cleaning After Fieldwork
Receiver
Remove dust and mud gently
Wipe the housing
Clean connectors carefully
Check port covers
Inspect mounting threads
Clean the T50 laser window appropriately
Controller
Clean the screen
Inspect keypad and charging port
Remove moisture
Check the holder
Pole and Tripod
Remove soil
Dry wet components
Inspect locks and clamps
Check the pointed tip
Store only after cleaning
Do not use aggressive solvents or unauthorised cleaning methods.
Wet Equipment
If equipment becomes wet:
Switch it off when appropriate
Wipe the exterior
Remove accessories according to approved procedures
Allow it to dry in a suitable environment
Keep connectors clean
Do not charge visibly wet equipment
Inspect for moisture before reuse
IP68 protection does not eliminate the need for proper handling.
Charging and Battery Care
Use suitable chargers and cables.
Avoid:
Damaged charging cables
Wet charging ports
Unapproved high-power chargers
Charging in excessive heat
Storing batteries completely discharged for long periods
Leaving equipment uninspected after charging problems
If battery endurance decreases significantly, record the operating conditions and arrange an assessment.
Storage
Store equipment:
In its protective case
In a dry environment
Away from excessive heat
Away from direct sunlight
Away from corrosive chemicals
With clean and protected connectors
With accessories organised
In a secure location
Do not store wet receivers, poles or tripods inside closed cases for extended periods.
Transport
During transport:
Use the original or suitable protective case
Secure the case inside the vehicle
Remove vulnerable external antennas
Prevent heavy items from pressing on the equipment
Avoid leaving the receiver loose in the vehicle
Check the equipment after a major impact
Perform a known-point test after a suspected drop or collision.
Firmware and Software Updates
Do not update equipment immediately before critical fieldwork unless necessary.
Before updating:
Record current versions
Back up project data
Confirm compatibility
Obtain the approved update
Review licence requirements
Prepare a recovery plan
After updating:
Test receiver connection
Test UHF or network corrections
Test import and export
Test IMU tilt
Test T50 laser and AR functions
Measure known control
Weekly Inspection
At least weekly for frequently used equipment, check:
Receiver housing
Connectors
Antennas
Batteries
Pole straightness
Pole bubble
Tripod clamps
Tribrach condition
Controller holder
Chargers
Cables
Software licence
Available storage
Record recurring problems instead of treating them as isolated incidents.
When to Stop Using the Equipment
Stop production work when:
Receiver housing is cracked
Water is visible inside a component
Mounting thread is loose
Base moves during the survey
Pole is bent
Antenna connector is damaged
Corrections repeatedly fail
Known-point checks exceed tolerance
Laser test fails repeatedly
IMU results are inconsistent
Battery becomes unusually hot or swollen
Coordinate system cannot be confirmed
Continuing work may create a larger and more expensive data problem.
Information for Technical Support
Provide:
Receiver model
Controller model
Serial number where required
Firmware version
tSurvey version
Project type
Correction method
Error message
Screenshots
Known-point results
Base coordinates
Pole and antenna heights
Site photographs
Description of any impact or water exposure
Steps already tested
Clear information helps distinguish setup, communication and hardware problems.
Daily RTK Checklist
Before Fieldwork
Batteries charged
Equipment complete
Receivers inspected
Antennas checked
Pole inspected
Tripod inspected
Controller working
Software licence active
Correct project loaded
Latest design imported
Control information available
At the Site
Safety assessment completed
Base installed securely
Base coordinates verified
Antenna height recorded
Corrections received
Coordinate system confirmed
Pole height entered
Fixed solution obtained
Known control checked
IMU, laser or AR tested where required
During Work
RTK status monitored
Correction age monitored
Point codes checked
Base condition inspected
Batteries monitored
Important points repeated
Control rechecked during long sessions
After Work
Final control check completed
Data backed up
Files exported and opened
Equipment cleaned
Wet items dried
Batteries charged appropriately
Damage recorded
Equipment stored securely
TOKNAV RTK Field Support in Malaysia
Contact MTM Precision for the TOKNAV T50, T10 Pro, TBase, PCR100T and tSurvey software, including equipment setup, daily field checks, known-point verification, troubleshooting, training and technical discussion in Malaysia.
MTM Precision Sdn. Bhd. (744811-A)
Telephone: +603-8080 7172
WhatsApp: +6016-660 7346
Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my
Website: www.mtmpre.com.my
Showroom & Service Centre:
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
18 Sep 2026