Temporary Flood Barrier for Warehouse and Factory Entrance Malaysia
Warehouse and factory entrances are often wider than normal shopfronts, allowing a large volume of rainwater to enter when drains overflow or surrounding roads become flooded.
A **modular ABS flood barrier** provides a reusable temporary solution that can be configured for loading bays, roller shutters, production areas and storage entrances.
Quick Product Summary
• ABS construction
• Approximate size: 70.5 × 68 × 52 cm per panel
• Approximate weight: 2.8 kg per panel
• L-shaped self-supporting design
• Interlocking modular connections
• Sealing and anti-slip strips
• Suitable for connecting across wide entrances
• Ready stock in Malaysia
• Bulk quantity available
Why Warehouses and Factories Need Flood Preparation
Even shallow water can affect:
• Raw materials
• Finished products
• Packaging materials
• Electrical equipment
• Production machinery
• Forklift routes
• Office and server areas
• Floor-level inventory
The cost of damaged goods and interrupted operations can be much higher than the cost of preparing temporary flood-control equipment.
Where Can the Barrier Be Used?
The modular system may be considered for:
• Warehouse roller-shutter entrances
• Factory production entrances
• Loading and unloading areas
• Maintenance workshops
• Equipment rooms
• Ground-floor storage areas
• Car park access points
• Guardhouse and office entrances
Facilities teams should identify every possible water-entry point rather than protecting only the main gate.
Estimating the Required Quantity
The number of panels depends on the complete entrance width and the overlap between connected units.
| Approximate Entrance Width | Initial Quantity Estimate |
|---|---:|
| 3 metres | 5 panels |
| 4 metres | 6–7 panels |
| 5 metres | 8 panels |
| 6 metres | 9–10 panels |
| 7 metres | 10–11 panels |
| 10 metres | 15–16 panels |
The final quantity may need to include extra panels for side coverage, corners or alternative layouts.
For multiple entrances, prepare a separate quantity plan for each location and label the stored panels accordingly.
Flood-Response Planning for Facilities Teams
A barrier is most effective when it forms part of a clear emergency procedure.
Before the rainy season:
1. Map all possible water-entry points.
2. Measure each entrance.
3. Assign the correct number of panels to each area.
4. Store the panels close to their deployment locations.
5. Train the responsible employees.
6. Conduct a full practice installation.
7. Inspect pumps, drains and emergency lighting.
8. Record the expected installation time.
This preparation is especially important for sites that operate at night, during weekends or with reduced manpower.
Installation at a Wide Entrance
For a warehouse or factory entrance:
1. Clean stones, debris and packaging material from the floor.
2. Place the first panel beyond one side of the opening.
3. Position the broad base toward the incoming water.
4. Connect and lock each additional panel.
5. Check that every sealing strip contacts the adjoining panel.
6. Extend the barrier beyond the opposite edge where possible.
7. Inspect floor drains and side gaps.
8. Keep the protected area under observation.
Two or more trained employees may be preferable for faster installation across a wide entrance.
ABS Flood Barrier or Sandbags?
For repeated flood preparation, modular panels can reduce the need to fill, transport and dispose of large quantities of sandbags.
The ABS system is:
• Lightweight before deployment
• Reusable
• Faster to prepare across a measured entrance
• Cleaner to store near production or inventory areas
• Easier to inspect before use
Sandbags may still be helpful around pipes, damaged floors, irregular corners and other areas where modular panels cannot make proper contact.
Important Limitations
A temporary barrier cannot guarantee complete flood prevention under every condition.
Performance can be affected by:
• Deep or fast-moving water
• Floating debris
• Uneven or oily floors
• Incorrect installation direction
• Damaged connectors or seals
• Water entering through drains or walls
• Insufficient side coverage
The panel height is approximately **52 cm**, but this is not a guaranteed safe water-retention depth. Sites with significant flood exposure should obtain an appropriate engineering or flood-risk assessment.
Frequently Asked Questions
Can forklifts cross the barrier?
No. The panels must be removed before vehicles or forklifts pass through the protected entrance.
Can the system remain installed every day?
It is designed as a temporary barrier. Permanent placement may obstruct operations, access or emergency routes.
Can we divide the order between several entrances?
Yes. Measure every entrance separately and prepare a labelled deployment set for each location.
Does it replace drainage pumps?
No. A flood barrier reduces water entry at selected points. Pumps and drainage may still be needed for seepage, rainwater or water entering from other areas.
Can companies purchase in bulk?
Yes. Bulk quantity is available for factories, warehouses, contractors, facility managers and multi-site businesses in Malaysia.
Request a Project Quantity Estimate
Send MTM Precision:
• Entrance width and height
• Photographs of each location
• Number of entrances
• Floor condition
• Expected direction of incoming water
• Required project quantity
We can help prepare an initial panel estimate for your warehouse or factory application.
**MTM Precision Sdn Bhd**
**Showroom & Service Centre:** No. 29-1 & 29-2, Jalan Bandar 18, Pusat Bandar Puchong, 47160 Puchong, Selangor, Malaysia
**Tel:** 03-8080 7172
**WhatsApp:** +6016-660 7346
**Email:** mtmpre@yahoo.com
**Website:** www.mtmpre.com.my
22 Sep 2026