TOKNAV T50 RTK for Drain and Trench Survey Malaysia
TOKNAV T50 RTK for Drain and Trench Survey Malaysia
Surveying drains, trenches and excavations can be difficult because the required point may be deep, water-filled, physically obstructed or unsafe to access with a conventional survey pole.
The TOKNAV T50 GNSS RTK Receiver combines centimetre-level RTK positioning, IMU tilt measurement and a 100m green laser to support selected measurements where direct pole placement is impractical.
This makes it relevant to drainage, road, utility, earthwork and infrastructure projects in Malaysia.
Why Drain Measurement Is Difficult
A drain or channel may present several practical problems:
The invert is too deep to reach safely
Water prevents stable pole placement
The surface is slippery
Traffic restricts operator access
Guardrails or fences block the point
The survey pole cannot be held vertically
The drain contains debris or flowing water
The operator would need to enter a confined or contaminated area
The GNSS receiver may be obstructed below ground level
Conventional RTK can still measure accessible drain points, but an additional method may be required for difficult locations.
TOKNAV T50 Relevant Specifications
GNSS channels: 1,408
RTK horizontal accuracy: ±(8 mm + 1 ppm)
RTK vertical accuracy: ±(15 mm + 1 ppm)
IMU tilt accuracy: Less than 2cm below 60°
Green-laser range: Up to 100m
Laser 3D positioning error: ≤2.5cm within 5m
AR stakeout: Supported
Integrated UHF: 410–470 MHz
Battery endurance: More than 16 hours in the stated network mode
Protection: IP68
Weight: Approximately 770g
The measurement method must be selected according to the required accuracy and site conditions.
Three Possible Drain-Measurement Methods
Method 1: Conventional Vertical Pole
Place the pole tip directly on the required point and hold the pole vertically.
Use this method when:
The point is safely accessible
The ground is stable
The pole can be positioned properly
Satellite visibility is adequate
Direct occupation is required
This remains the simplest method for suitable points.
Method 2: IMU Tilt Measurement
Place the pole tip on the required point but tilt the pole away from the obstruction.
Use this method when:
The point can be reached
A wall or drain edge prevents vertical positioning
The operator needs to keep the receiver away from an obstruction
The pole tip can remain stable
The T50 provides published tilt accuracy of less than 2cm at tilt angles below 60°.
Method 3: Green-Laser Measurement
Position the receiver at a stable and safe location, then aim the green laser toward the visible target.
Use this method when:
The pole cannot reach the point
The target is visible
Direct access is unsafe
A trench, barrier or water prevents occupation
The target surface is suitable for laser aiming
The operator must consider distance, surface, visibility and project tolerance.
Drain Features That May Be Surveyed
Subject to site suitability, the T50 may assist with:
Drain edges
Top-of-wall points
Invert positions
Culvert openings
Channel corners
Headwall features
Manhole-related external points
Outfall structures
Retaining-wall points
Drain alignment features
Not every surface is suitable for laser measurement. Dark, reflective, wet, moving or irregular targets can affect visibility and measurement consistency.
Trench and Excavation Applications
Open trenches create safety risks and can make direct pole measurement impractical.
Possible applications include:
Trench-edge survey
Utility-route recording
Excavation progress
Pipe-location documentation
Formation-level checks
Selected trench-bottom points
As-built infrastructure positions
The operator must remain behind the required site barricades and follow all excavation-safety procedures.
A surveying function does not replace safe access planning or risk assessment.
Practical Field Workflow
1. Review the Required Accuracy
Determine whether the point is for:
Preliminary survey
Progress monitoring
Construction control
Design verification
Final as-built documentation
The required accuracy may determine whether laser measurement is acceptable.
2. Establish the RTK Correction
Connect the T50 to:
TOKNAV TBase
A compatible CORS service
VRS or NTRIP corrections
Another approved source
Confirm a stable fixed solution.
3. Check a Known Point
Measure an independent control point before surveying the drain or trench.
4. Select the Measurement Method
Use conventional pole, IMU tilt or green laser according to the point condition.
5. Stabilise the Receiver
Stand on stable ground and avoid movement during laser aiming.
6. Identify the Exact Target
Confirm whether the required feature is the invert, edge, corner, wall or another surface.
7. Measure and Repeat
Repeat important observations and compare the results.
8. Record the Method
Use a clear point code or note to identify measurements captured by laser rather than direct pole occupation.
Laser Accuracy Considerations
The official specification states a three-dimensional positioning error of no more than 2.5cm for laser measurement within 5m.
Do not automatically apply this figure to every distance up to 100m.
Actual performance can be influenced by:
Target distance
Surface colour
Surface reflectivity
Water
Bright sunlight
Laser-spot visibility
Receiver movement
GNSS quality
Multipath
Aiming angle
Operator technique
Test the system against a known target before relying on it for critical work.
Working Near Water
When measuring drains containing water:
Avoid aiming only at the water surface
Identify a stable structural target where possible
Watch for reflection
Repeat the measurement
Compare with surrounding points
Record any uncertainty
Use another method if the target cannot be defined clearly
Flowing water does not provide a stable physical surface for a fixed structural measurement.
Working Beside Roads
Drainage surveys often take place near traffic.
Field planning should include:
Traffic-management procedures
High-visibility clothing
Safe equipment position
Stable operator location
Appropriate warning signs
A second person where required
Avoiding unnecessary entry into the carriageway
The green-laser function may reduce some physical access requirements, but it does not remove traffic risk.
T50 with TOKNAV TBase
The T50 can be paired with the TBase for an independent UHF Base and Rover system.
TBase specifications include:
1,408 GNSS channels
410–470 MHz UHF
1W, 2W or 5W radio power
13,800mAh battery
More than 12 hours of Base operation using the 5W radio
IP68 protection
For linear drainage projects, radio performance will depend on terrain, structures, antenna height and line of sight.
When T10 Pro May Be Sufficient
Choose the more economical T10 Pro when:
Drain points are accessible
Most measurements use a survey pole
IMU tilt solves the main obstruction
Laser measurement is unnecessary
Standard construction and topographic survey is the priority
Choose the T50 when inaccessible drain, trench and structural points occur frequently enough to justify its specialised laser capability.
Common Measurement Mistakes
Recording a Float solution
Measuring an unclear target
Aiming at moving water
Assuming 100m laser range means the same accuracy at every distance
Failing to repeat important points
Using the wrong pole height
Incorrect Base coordinates
Poor coordinate-system setup
No known-point verification
Failing to identify laser-measured points in the field record
TOKNAV T50 Drain Survey RTK Supplier in Malaysia
Contact MTM Precision for the TOKNAV T50, TBase and tSurvey 2.0, including green-laser RTK configuration, demonstration, quotation and technical discussion in Malaysia.
MTM Precision Sdn. Bhd. (744811-A)
Telephone: +603-8080 7172
WhatsApp: +6016-660 7346
Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my
Website: www.mtmpre.com.my
Showroom & Service Centre:
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
18 Sep 2026