TOKNAV T10 Pro for Earthwork and Cut Fill Survey Malaysia
TOKNAV T10 Pro for Earthwork and Cut Fill Survey Malaysia
The TOKNAV T10 Pro is a GNSS RTK receiver suitable for earthwork surveys, site-level measurement, formation checks and cut-and-fill stakeout.
It combines 1,408 GNSS channels, centimetre-level RTK positioning, IMU tilt measurement and long battery endurance in a lightweight IP68 receiver.
When configured with the correct project control and design data, the T10 Pro can help contractors, surveyors and engineers monitor earthwork progress across construction sites in Malaysia.
What Is an Earthwork Survey?
An earthwork survey measures the existing or constructed ground surface to determine:
Original ground levels
Current site levels
Proposed formation levels
Excavation depth
Required fill
Stockpile quantities
Cut-and-fill boundaries
Earthwork progress
Final platform levels
Approximate material volumes
Earthwork measurement is commonly required for:
Building platforms
Road construction
Housing developments
Industrial sites
Drainage projects
Land reclamation
Quarry operations
Embankments
Ponds and reservoirs
Solar farms
Plantation infrastructure
Reliable earthwork results require more than collecting many points. The survey must represent the actual shape of the ground.
TOKNAV T10 Pro Key Specifications
GNSS channels: 1,408
RTK horizontal accuracy: ±(8 mm + 1 ppm)
RTK vertical accuracy: ±(15 mm + 1 ppm)
Static horizontal accuracy: ±(2.5 mm + 0.5 ppm)
Static vertical accuracy: ±(5 mm + 0.5 ppm)
IMU tilt range: Up to 60°
Tilt accuracy: ≤2cm within 60°
Data update rate: 5Hz typical, up to 20Hz
Integrated UHF: 410–470 MHz
Radio power: 0.5W/1.5W
Battery: 9600mAh
Typical Rover endurance: More than 16 hours
Internal storage: 32GB
Connectivity: 4G, Wi-Fi, Bluetooth and NFC
Protection: IP68
Drop resistance: 1.5m
Weight: Approximately 740g
Actual survey accuracy depends on the correction source, satellite environment, control network, coordinate system, pole setup and field procedure.
Why Use RTK for Earthwork Measurement?
Fast Ground-Point Collection
The operator can move around an open site and collect surface points without requiring continuous line of sight to a Total Station.
Direct Coordinate and Elevation Recording
Each point is recorded with:
Easting
Northing
Elevation
Point number
Feature code
Description
Large-Site Coverage
RTK is suitable for measuring widely distributed ground features across development and infrastructure sites.
Cut-and-Fill Guidance
The field software can compare the current elevation with the required design elevation and indicate whether excavation or filling is required.
One-Person Workflow
Many routine earthwork measurements can be performed by one trained operator, subject to site safety requirements.
Common Earthwork Survey Stages
Original Ground Survey
The original ground survey records the site before clearing, excavation or filling begins.
This survey provides the reference surface for later volume calculations.
Important features may include:
Natural ground
Existing roads
Drains
Banks
Slopes
Depressions
Stockpiles
Existing structures
Water edges
Rock outcrops
The original survey should be agreed upon before major ground disturbance begins.
Progress Survey
Progress surveys measure the changing ground surface during construction.
They may be conducted:
Weekly
Monthly
At payment stages
After major excavation
After filling and compaction
Before the next construction phase
Consistent survey boundaries and control points make comparisons more reliable.
Final Earthwork Survey
The final survey confirms the completed surface and supports:
Final quantity calculation
Formation-level checking
As-built documentation
Contractor claims
Engineer verification
Handover records
T10 Pro Earthwork Survey Workflow
1. Confirm the Survey Purpose
Determine whether the survey is for:
Preliminary estimation
Tender preparation
Progress monitoring
Payment claim
Design comparison
Final measurement
The purpose affects the required accuracy, point density and documentation.
2. Establish Project Control
Confirm:
Horizontal datum
Projection
Coordinate zone
Vertical datum
Benchmarks
Control-point coordinates
Site localization
Independent check points
The same control framework should be used for the original, progress and final surveys.
3. Configure the RTK Correction
Connect the T10 Pro to:
TOKNAV TBase
Compatible local Base
CORS service
VRS network
NTRIP correction source
Confirm a stable Fixed solution before collecting data.
4. Check a Known Point
Measure an independent known point and compare the result with the approved coordinate and elevation.
Do not begin production measurement when the control check falls outside the accepted tolerance.
5. Enter the Correct Pole Height
Check the physical pole height and the value entered into the software.
A pole-height error directly affects every recorded ground elevation.
6. Collect Surface Points
Collect points across the site with additional observations at:
Changes of slope
Top of bank
Bottom of bank
Drain edges
Platform edges
Ridges
Depressions
Toe of slope
Crest of slope
Road edges
Material boundaries
7. Record Breaklines
Breaklines define locations where the ground surface changes direction sharply.
Examples include:
Drain channels
Retaining-wall edges
Road shoulders
Platform boundaries
Embankment crests
Slope toes
Excavation edges
A surface generated without correct breaklines may produce inaccurate volumes even when many points were collected.
8. Review the Data in the Field
Before leaving the site, check:
Coverage
Point spacing
Missing areas
Incorrect codes
Unusual elevations
Duplicate points
Survey boundary
Control checks
Returning to collect missing information increases cost and delays reporting.
How Many Ground Points Are Required?
There is no single point spacing suitable for every site.
Point density should reflect:
Terrain complexity
Required contour interval
Survey purpose
Volume tolerance
Site size
Design requirements
Ground visibility
Breakline frequency
A flat open platform may require fewer points than an irregular excavation containing slopes, benches and stockpiles.
Collect more points where the ground changes shape.
Uniform point spacing alone does not guarantee an accurate surface model.
Cut-and-Fill Stakeout
Cut-and-fill stakeout guides site personnel toward the proposed formation level.
The controller may display:
Existing elevation
Design elevation
Cut amount
Fill amount
Horizontal position
Offset from alignment
Chainage
For example:
Cut 0.80m means the current ground is approximately 0.80m above the selected design level.
Fill 0.45m means the current ground is approximately 0.45m below the selected design level.
The actual display convention must be confirmed in the software. Do not assume every application uses the same positive and negative signs.
Formation-Level Checking
Formation checks may be required for:
Building platforms
Road subgrade
Drain beds
Pipe trenches
Floor bases
Car parks
Embankments
Landscaping areas
Before checking a formation level, verify:
Design revision
Vertical datum
Benchmark
Pole height
Design surface
Layer thickness
Required tolerance
A design platform may contain gradients rather than one uniform elevation.
Stockpile Volume Survey
The T10 Pro can collect points around and across a stockpile for later surface and volume calculation.
A typical workflow includes:
Measure the stockpile boundary.
Record the surrounding base surface.
Collect points around the toe.
Measure changes in slope.
Survey the crest.
Collect sufficient points across the top.
Record any inaccessible areas.
Process the surface in suitable software.
The result depends strongly on whether the stockpile’s base can be defined correctly.
Vegetation, machinery, material movement and unsafe slopes can affect the survey.
Excavation Volume Survey
For an excavation, collect:
Top edge
Bottom edge
Corners
Benches
Side slopes
Bottom surface
Changes in depth
Temporary ramps
Material left inside
Do not enter an unsafe excavation merely to collect additional points.
Where the pole cannot safely reach a visible target, consider a more suitable method or specialised receiver such as the TOKNAV T50 with green-laser measurement, subject to the required tolerance.
Using IMU Tilt Measurement
The T10 Pro supports pole tilt up to approximately 60°.
IMU tilt measurement may help near:
Excavation edges
Retaining walls
Stockpiles
Construction barriers
Drain walls
Materials or machinery
The pole tip must remain securely on the required point.
For important height observations, repeat the measurement or compare it with a vertical-pole reading.
IMU tilt cannot correct:
Wrong pole height
Wrong benchmark
Incorrect Base coordinates
Incorrect design elevation
Unstable ground
Poor GNSS conditions
Volume Calculation Methods
Earthwork quantities may be calculated by comparing:
Original ground and current ground
Current ground and design surface
Original ground and final surface
Two progress-survey surfaces
Stockpile surface and defined base
Common approaches include:
Triangulated surface comparison
Grid volume
Cross-section calculation
Average-end-area method
Design-surface comparison
The T10 Pro collects the field coordinates. Final volume accuracy also depends on the processing method and surface model.
Factors That Affect Earthwork Volume Accuracy
Incomplete Survey Boundary
Missing edges can cause the software to create an incorrect surface.
Insufficient Breaklines
The calculated surface may cut across drains, slopes or platform edges.
Poor Point Distribution
Large unsurveyed areas may be interpolated incorrectly.
Different Survey Control
Original and progress surveys may not align if they use different datums or localization parameters.
Wrong Vertical Reference
A systematic height shift can create a major volume difference.
Vegetation
Measurements taken on grass or loose debris may not represent the actual soil surface.
Active Machinery
Excavators and trucks can block points or alter the surface during measurement.
Undefined Stockpile Base
The software must estimate the bottom surface when it cannot be measured directly.
Wrong Design Revision
Comparing the field surface against an outdated design produces misleading cut-and-fill values.
T10 Pro with TOKNAV TBase
The T10 Pro can receive UHF corrections from the TOKNAV TBase.
The TBase provides:
1,408 GNSS channels
410–470 MHz UHF
1W, 2W and 5W radio settings
13,800mAh battery
More than 12 hours of stated Base operation at 5W
IP68 protection
32GB internal storage
A local Base may be suitable for earthwork sites where:
Mobile coverage is weak
Independent operation is required
Verified project control is available
The site operates continuously
A secure Base position can be established
Check the Base coordinate carefully before every survey.
Network RTK for Earthwork Sites
Network RTK can be convenient when:
Mobile coverage is reliable
A compatible service covers the project
The operator visits several sites
Fast mobilisation is required
Installing a local Base is impractical
Monitor:
Correction-data age
Mobile signal
RTK status
Repeated-point consistency
Known-point checks
A Fixed solution should still be checked against project control.
T10 Pro Versus T50 for Earthwork Applications
Choose the TOKNAV T10 Pro when:
Ground points are accessible
Standard pole measurement is practical
IMU tilt solves most obstructions
General earthwork surveying is the priority
A more economical RTK solution is preferred
Choose the TOKNAV T50 when:
Deep drains or excavations are common
Some surfaces cannot be reached safely
Green-laser measurement is useful
Inaccessible-point measurement is frequently required
AR stakeout is valuable
The laser method must still match the project’s accuracy requirements.
Earthwork Survey Quality-Control Checklist
Before measurement:
Confirm the survey purpose
Check the latest design
Verify the coordinate system
Confirm the vertical datum
Inspect control points
Enter the correct pole height
Test the correction connection
Measure a known check point
During measurement:
Record only stable Fixed observations
Collect breaklines
Increase point density around ground changes
Monitor correction-data age
Use consistent feature codes
Repeat important points
Record inaccessible areas
Protect the operator from machinery and slopes
After measurement:
Recheck known control
Review site coverage
Identify unusual elevations
Back up the project
Export the raw observations
Preserve the original field data
Record the processing method
Document assumptions and exclusions
Common Earthwork Survey Mistakes
Measuring without an agreed survey boundary
Using the wrong benchmark
Incorrect pole height
Missing slope crests and toes
Recording Float observations
Collecting too few points
Ignoring breaklines
Comparing surfaces from different coordinate systems
Using an outdated design file
Failing to keep the raw survey data
Reporting volume without explaining the calculation method
Surveying too close to active machinery
TOKNAV Earthwork RTK Supplier in Malaysia
Contact MTM Precision for the TOKNAV T10 Pro, T50, TBase, PCR100T and tSurvey software, including RTK package configuration, earthwork workflow discussion, demonstration and quotation in Malaysia.
MTM Precision Sdn. Bhd. (744811-A)
Telephone: +603-8080 7172
WhatsApp: +6016-660 7346
Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my
Website: www.mtmpre.com.my
Showroom & Service Centre:
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
18 Sep 2026