TOKNAV T10 Pro for Earthwork and Cut Fill Survey Malaysia

TOKNAV T10 Pro for Earthwork and Cut Fill Survey Malaysia

 

The TOKNAV T10 Pro is a GNSS RTK receiver suitable for earthwork surveys, site-level measurement, formation checks and cut-and-fill stakeout.

 

It combines 1,408 GNSS channels, centimetre-level RTK positioning, IMU tilt measurement and long battery endurance in a lightweight IP68 receiver.

 

When configured with the correct project control and design data, the T10 Pro can help contractors, surveyors and engineers monitor earthwork progress across construction sites in Malaysia.

 

What Is an Earthwork Survey?

 

An earthwork survey measures the existing or constructed ground surface to determine:

 

Original ground levels

 

Current site levels

 

Proposed formation levels

 

Excavation depth

 

Required fill

 

Stockpile quantities

 

Cut-and-fill boundaries

 

Earthwork progress

 

Final platform levels

 

Approximate material volumes

 

Earthwork measurement is commonly required for:

 

Building platforms

 

Road construction

 

Housing developments

 

Industrial sites

 

Drainage projects

 

Land reclamation

 

Quarry operations

 

Embankments

 

Ponds and reservoirs

 

Solar farms

 

Plantation infrastructure

 

Reliable earthwork results require more than collecting many points. The survey must represent the actual shape of the ground.

 

TOKNAV T10 Pro Key Specifications

 

GNSS channels: 1,408

 

RTK horizontal accuracy: ±(8 mm + 1 ppm)

 

RTK vertical accuracy: ±(15 mm + 1 ppm)

 

Static horizontal accuracy: ±(2.5 mm + 0.5 ppm)

 

Static vertical accuracy: ±(5 mm + 0.5 ppm)

 

IMU tilt range: Up to 60°

 

Tilt accuracy: ≤2cm within 60°

 

Data update rate: 5Hz typical, up to 20Hz

 

Integrated UHF: 410–470 MHz

 

Radio power: 0.5W/1.5W

 

Battery: 9600mAh

 

Typical Rover endurance: More than 16 hours

 

Internal storage: 32GB

 

Connectivity: 4G, Wi-Fi, Bluetooth and NFC

 

Protection: IP68

 

Drop resistance: 1.5m

 

Weight: Approximately 740g

 

Actual survey accuracy depends on the correction source, satellite environment, control network, coordinate system, pole setup and field procedure.

 

Why Use RTK for Earthwork Measurement?

 

Fast Ground-Point Collection

 

The operator can move around an open site and collect surface points without requiring continuous line of sight to a Total Station.

 

Direct Coordinate and Elevation Recording

 

Each point is recorded with:

 

Easting

 

Northing

 

Elevation

 

Point number

 

Feature code

 

Description

 

Large-Site Coverage

 

RTK is suitable for measuring widely distributed ground features across development and infrastructure sites.

 

Cut-and-Fill Guidance

 

The field software can compare the current elevation with the required design elevation and indicate whether excavation or filling is required.

 

One-Person Workflow

 

Many routine earthwork measurements can be performed by one trained operator, subject to site safety requirements.

 

Common Earthwork Survey Stages

 

Original Ground Survey

 

The original ground survey records the site before clearing, excavation or filling begins.

 

This survey provides the reference surface for later volume calculations.

 

Important features may include:

 

Natural ground

 

Existing roads

 

Drains

 

Banks

 

Slopes

 

Depressions

 

Stockpiles

 

Existing structures

 

Water edges

 

Rock outcrops

 

The original survey should be agreed upon before major ground disturbance begins.

 

Progress Survey

 

Progress surveys measure the changing ground surface during construction.

 

They may be conducted:

 

Weekly

 

Monthly

 

At payment stages

 

After major excavation

 

After filling and compaction

 

Before the next construction phase

 

Consistent survey boundaries and control points make comparisons more reliable.

 

Final Earthwork Survey

 

The final survey confirms the completed surface and supports:

 

Final quantity calculation

 

Formation-level checking

 

As-built documentation

 

Contractor claims

 

Engineer verification

 

Handover records

 

T10 Pro Earthwork Survey Workflow

 

1. Confirm the Survey Purpose

 

Determine whether the survey is for:

 

Preliminary estimation

 

Tender preparation

 

Progress monitoring

 

Payment claim

 

Design comparison

 

Final measurement

 

The purpose affects the required accuracy, point density and documentation.

 

2. Establish Project Control

 

Confirm:

 

Horizontal datum

 

Projection

 

Coordinate zone

 

Vertical datum

 

Benchmarks

 

Control-point coordinates

 

Site localization

 

Independent check points

 

The same control framework should be used for the original, progress and final surveys.

 

3. Configure the RTK Correction

 

Connect the T10 Pro to:

 

TOKNAV TBase

 

Compatible local Base

 

CORS service

 

VRS network

 

NTRIP correction source

 

Confirm a stable Fixed solution before collecting data.

 

4. Check a Known Point

 

Measure an independent known point and compare the result with the approved coordinate and elevation.

 

Do not begin production measurement when the control check falls outside the accepted tolerance.

 

5. Enter the Correct Pole Height

 

Check the physical pole height and the value entered into the software.

 

A pole-height error directly affects every recorded ground elevation.

 

6. Collect Surface Points

 

Collect points across the site with additional observations at:

 

Changes of slope

 

Top of bank

 

Bottom of bank

 

Drain edges

 

Platform edges

 

Ridges

 

Depressions

 

Toe of slope

 

Crest of slope

 

Road edges

 

Material boundaries

 

7. Record Breaklines

 

Breaklines define locations where the ground surface changes direction sharply.

 

Examples include:

 

Drain channels

 

Retaining-wall edges

 

Road shoulders

 

Platform boundaries

 

Embankment crests

 

Slope toes

 

Excavation edges

 

A surface generated without correct breaklines may produce inaccurate volumes even when many points were collected.

 

8. Review the Data in the Field

 

Before leaving the site, check:

 

Coverage

 

Point spacing

 

Missing areas

 

Incorrect codes

 

Unusual elevations

 

Duplicate points

 

Survey boundary

 

Control checks

 

Returning to collect missing information increases cost and delays reporting.

 

How Many Ground Points Are Required?

 

There is no single point spacing suitable for every site.

 

Point density should reflect:

 

Terrain complexity

 

Required contour interval

 

Survey purpose

 

Volume tolerance

 

Site size

 

Design requirements

 

Ground visibility

 

Breakline frequency

 

A flat open platform may require fewer points than an irregular excavation containing slopes, benches and stockpiles.

 

Collect more points where the ground changes shape.

 

Uniform point spacing alone does not guarantee an accurate surface model.

 

Cut-and-Fill Stakeout

 

Cut-and-fill stakeout guides site personnel toward the proposed formation level.

 

The controller may display:

 

Existing elevation

 

Design elevation

 

Cut amount

 

Fill amount

 

Horizontal position

 

Offset from alignment

 

Chainage

 

For example:

 

Cut 0.80m means the current ground is approximately 0.80m above the selected design level.

 

Fill 0.45m means the current ground is approximately 0.45m below the selected design level.

 

The actual display convention must be confirmed in the software. Do not assume every application uses the same positive and negative signs.

 

Formation-Level Checking

 

Formation checks may be required for:

 

Building platforms

 

Road subgrade

 

Drain beds

 

Pipe trenches

 

Floor bases

 

Car parks

 

Embankments

 

Landscaping areas

 

Before checking a formation level, verify:

 

Design revision

 

Vertical datum

 

Benchmark

 

Pole height

 

Design surface

 

Layer thickness

 

Required tolerance

 

A design platform may contain gradients rather than one uniform elevation.

 

Stockpile Volume Survey

 

The T10 Pro can collect points around and across a stockpile for later surface and volume calculation.

 

A typical workflow includes:

 

Measure the stockpile boundary.

 

Record the surrounding base surface.

 

Collect points around the toe.

 

Measure changes in slope.

 

Survey the crest.

 

Collect sufficient points across the top.

 

Record any inaccessible areas.

 

Process the surface in suitable software.

 

The result depends strongly on whether the stockpile’s base can be defined correctly.

 

Vegetation, machinery, material movement and unsafe slopes can affect the survey.

 

Excavation Volume Survey

 

For an excavation, collect:

 

Top edge

 

Bottom edge

 

Corners

 

Benches

 

Side slopes

 

Bottom surface

 

Changes in depth

 

Temporary ramps

 

Material left inside

 

Do not enter an unsafe excavation merely to collect additional points.

 

Where the pole cannot safely reach a visible target, consider a more suitable method or specialised receiver such as the TOKNAV T50 with green-laser measurement, subject to the required tolerance.

 

Using IMU Tilt Measurement

 

The T10 Pro supports pole tilt up to approximately 60°.

 

IMU tilt measurement may help near:

 

Excavation edges

 

Retaining walls

 

Stockpiles

 

Construction barriers

 

Drain walls

 

Materials or machinery

 

The pole tip must remain securely on the required point.

 

For important height observations, repeat the measurement or compare it with a vertical-pole reading.

 

IMU tilt cannot correct:

 

Wrong pole height

 

Wrong benchmark

 

Incorrect Base coordinates

 

Incorrect design elevation

 

Unstable ground

 

Poor GNSS conditions

 

Volume Calculation Methods

 

Earthwork quantities may be calculated by comparing:

 

Original ground and current ground

 

Current ground and design surface

 

Original ground and final surface

 

Two progress-survey surfaces

 

Stockpile surface and defined base

 

Common approaches include:

 

Triangulated surface comparison

 

Grid volume

 

Cross-section calculation

 

Average-end-area method

 

Design-surface comparison

 

The T10 Pro collects the field coordinates. Final volume accuracy also depends on the processing method and surface model.

 

Factors That Affect Earthwork Volume Accuracy

 

Incomplete Survey Boundary

 

Missing edges can cause the software to create an incorrect surface.

 

Insufficient Breaklines

 

The calculated surface may cut across drains, slopes or platform edges.

 

Poor Point Distribution

 

Large unsurveyed areas may be interpolated incorrectly.

 

Different Survey Control

 

Original and progress surveys may not align if they use different datums or localization parameters.

 

Wrong Vertical Reference

 

A systematic height shift can create a major volume difference.

 

Vegetation

 

Measurements taken on grass or loose debris may not represent the actual soil surface.

 

Active Machinery

 

Excavators and trucks can block points or alter the surface during measurement.

 

Undefined Stockpile Base

 

The software must estimate the bottom surface when it cannot be measured directly.

 

Wrong Design Revision

 

Comparing the field surface against an outdated design produces misleading cut-and-fill values.

 

T10 Pro with TOKNAV TBase

 

The T10 Pro can receive UHF corrections from the TOKNAV TBase.

 

The TBase provides:

 

1,408 GNSS channels

 

410–470 MHz UHF

 

1W, 2W and 5W radio settings

 

13,800mAh battery

 

More than 12 hours of stated Base operation at 5W

 

IP68 protection

 

32GB internal storage

 

A local Base may be suitable for earthwork sites where:

 

Mobile coverage is weak

 

Independent operation is required

 

Verified project control is available

 

The site operates continuously

 

A secure Base position can be established

 

Check the Base coordinate carefully before every survey.

 

Network RTK for Earthwork Sites

 

Network RTK can be convenient when:

 

Mobile coverage is reliable

 

A compatible service covers the project

 

The operator visits several sites

 

Fast mobilisation is required

 

Installing a local Base is impractical

 

Monitor:

 

Correction-data age

 

Mobile signal

 

RTK status

 

Repeated-point consistency

 

Known-point checks

 

A Fixed solution should still be checked against project control.

 

T10 Pro Versus T50 for Earthwork Applications

 

Choose the TOKNAV T10 Pro when:

 

Ground points are accessible

 

Standard pole measurement is practical

 

IMU tilt solves most obstructions

 

General earthwork surveying is the priority

 

A more economical RTK solution is preferred

 

Choose the TOKNAV T50 when:

 

Deep drains or excavations are common

 

Some surfaces cannot be reached safely

 

Green-laser measurement is useful

 

Inaccessible-point measurement is frequently required

 

AR stakeout is valuable

 

The laser method must still match the project’s accuracy requirements.

 

Earthwork Survey Quality-Control Checklist

 

Before measurement:

 

Confirm the survey purpose

 

Check the latest design

 

Verify the coordinate system

 

Confirm the vertical datum

 

Inspect control points

 

Enter the correct pole height

 

Test the correction connection

 

Measure a known check point

 

During measurement:

 

Record only stable Fixed observations

 

Collect breaklines

 

Increase point density around ground changes

 

Monitor correction-data age

 

Use consistent feature codes

 

Repeat important points

 

Record inaccessible areas

 

Protect the operator from machinery and slopes

 

After measurement:

 

Recheck known control

 

Review site coverage

 

Identify unusual elevations

 

Back up the project

 

Export the raw observations

 

Preserve the original field data

 

Record the processing method

 

Document assumptions and exclusions

 

Common Earthwork Survey Mistakes

 

Measuring without an agreed survey boundary

 

Using the wrong benchmark

 

Incorrect pole height

 

Missing slope crests and toes

 

Recording Float observations

 

Collecting too few points

 

Ignoring breaklines

 

Comparing surfaces from different coordinate systems

 

Using an outdated design file

 

Failing to keep the raw survey data

 

Reporting volume without explaining the calculation method

 

Surveying too close to active machinery

 

TOKNAV Earthwork RTK Supplier in Malaysia

 

Contact MTM Precision for the TOKNAV T10 Pro, T50, TBase, PCR100T and tSurvey software, including RTK package configuration, earthwork workflow discussion, demonstration and quotation in Malaysia.

 

MTM Precision Sdn. Bhd. (744811-A)

 

Telephone: +603-8080 7172

WhatsApp: +6016-660 7346

Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my

Website: www.mtmpre.com.my

 

Showroom & Service Centre:

No. 29-1 & 29-2, Jalan Bandar 18,

Pusat Bandar Puchong,

47160 Puchong, Selangor, Malaysia.


 

18 Sep 2026