TOKNAV T10 Pro for Construction Stakeout Malaysia
TOKNAV T10 Pro for Construction Stakeout Malaysia
The TOKNAV T10 Pro is a GNSS RTK receiver designed for construction setting out, topographic survey, earthwork measurement and other engineering applications.
With 1,408 GNSS channels, centimetre-level RTK positioning and IMU tilt measurement up to 60°, the T10 Pro allows surveyors and construction teams to locate design coordinates directly in the field.
It can operate as a Rover with the TOKNAV TBase or connect to a compatible CORS, VRS or NTRIP correction service in Malaysia.
What Is Construction Stakeout?
Construction stakeout transfers design information from a drawing or digital model onto the actual project site.
The operator uses known coordinates to identify where a feature should be constructed.
Typical stakeout work includes:
Building corners
Column positions
Grid lines
Road centre lines
Drain alignments
Manholes
Culverts
Utility routes
Earthwork boundaries
Slope points
Piling locations
Formation levels
Kerb lines
Fence lines
Landscape features
The required accuracy depends on the feature and project specification.
GNSS RTK is highly productive for suitable outdoor points, but it does not replace a Total Station for every precision structural application.
TOKNAV T10 Pro Key Specifications
GNSS channels: 1,408
RTK horizontal accuracy: ±(8 mm + 1 ppm)
RTK vertical accuracy: ±(15 mm + 1 ppm)
Static horizontal accuracy: ±(2.5 mm + 0.5 ppm)
Static vertical accuracy: ±(5 mm + 0.5 ppm)
IMU tilt range: Up to 60°
Tilt accuracy: ≤2cm within 60°
Data update rate: 5Hz typical, up to 20Hz
Integrated UHF: 410–470 MHz
UHF power: 0.5W/1.5W
Battery capacity: 9600mAh
Typical Rover endurance: More than 16 hours
Internal storage: 32GB
Communication: 4G, Wi-Fi, Bluetooth and NFC
Environmental protection: IP68
Drop resistance: 1.5m
Weight: Approximately 740g
Published specifications describe performance under suitable conditions. Actual site results depend on control quality, coordinate-system setup, correction data, satellite visibility and operating procedure.
Why Use RTK for Construction Stakeout?
Direct Coordinate Stakeout
The design coordinates can be imported into the field software and selected individually for setting out.
The controller displays the direction and distance required to reach the target.
Fast Movement Across Open Sites
The operator does not need to maintain line of sight to a Total Station while moving between widely distributed points.
This can improve productivity on:
Housing developments
Road projects
Earthwork sites
Large factories
Infrastructure corridors
Solar farms
Plantation projects
Drainage construction
One-Person Operation
Many RTK stakeout tasks can be completed by one trained operator, subject to the site’s safety procedures.
IMU Tilt Measurement
The survey pole can be tilted while the pole tip remains on the required point.
This is useful when a vertical pole position is obstructed by:
Construction materials
Barriers
Walls
Vegetation
Traffic cones
Excavation edges
T10 Pro Stakeout Workflow
1. Confirm the Design Data
Before going to the site, verify:
Coordinate system
Datum
Projection
Zone
Units
Elevation reference
Drawing revision
Point names
Design coordinates
Do not stake out directly from an unverified coordinate file.
2. Select the RTK Correction Method
The T10 Pro requires correction data from either:
TOKNAV TBase
Compatible local Base
CORS
VRS
NTRIP correction service
Choose the method according to mobile coverage, project control, site size and documentation requirements.
3. Create the Project
Set up the project in compatible TOKNAV tSurvey software.
Confirm:
Project name
Coordinate system
Distance units
Height units
Geoid or vertical model
Localization parameters
Antenna height
Correction source
4. Check Known Control
Measure at least one verified control or check point before beginning stakeout.
Compare:
Easting
Northing
Elevation
Horizontal difference
Vertical difference
If the result falls outside the accepted tolerance, stop and investigate the setup.
5. Import the Stakeout Points
Import the approved coordinate or CAD file into the controller.
Depending on the supplied software version, supported workflows may include:
Point stakeout
Line stakeout
CAD stakeout
Road stakeout
Surface-related work
LandXML data
Test the required format before starting a large project.
6. Select the Required Point
Choose the design point from the point list or drawing.
The controller should display information such as:
Point name
Target coordinate
Current distance
Direction
Cut or fill
Elevation difference
7. Move Toward the Point
Follow the controller’s directional guidance.
As the distance becomes smaller:
Walk more slowly
Keep the pole tip stable
Confirm the RTK remains Fixed
Watch the correction-data age
Avoid changing pole height
Allow the reading to settle
8. Mark the Position
Depending on the site, mark the point using:
Survey peg
Nail
Paint
Chalk
Pin
Marker
Offset reference
Protect important marks from machinery and site traffic.
9. Store the As-Staked Point
Record the measured coordinate rather than relying only on the physical mark.
Use a clear description showing:
Design point
Actual staked coordinate
Time
Operator
Point code
Relevant remarks
10. Perform an Independent Check
Check important points using:
A second observation
A different control point
An offset measurement
Total Station verification
Tape or distance check
Another qualified surveyor
Critical structural work should not depend on one unchecked observation.
Point Stakeout
Point stakeout is suitable when individual design coordinates are already available.
Examples include:
Building corners
Pile centres
Manholes
Signboard locations
Utility chambers
Borehole positions
Lighting poles
The operator selects one point at a time and follows the field guidance until the Rover reaches the required position.
Use logical point names so the operator can identify the correct feature easily.
Line Stakeout
Line stakeout is used when the required position lies along a defined alignment.
Possible applications include:
Drain lines
Road edges
Fences
Pipelines
Kerbs
Retaining walls
Utility routes
The software may show the current chainage and left-or-right offset from the line.
Confirm the line direction before work begins. Reversing the start and end points may create confusing chainage or offset information.
Road Stakeout
Road projects may require more structured design information, including:
Centre-line alignment
Chainage
Horizontal curves
Vertical profile
Cross sections
Road edges
Cut-and-fill values
Slope points
Before fieldwork, test the road file and confirm that the imported alignment matches the approved design.
For complex road projects, the field team must understand the relationship between the design alignment, stationing and required offsets.
Cut-and-Fill Guidance
RTK stakeout can help identify the difference between the current ground level and the design elevation.
The controller may indicate:
Cut required
Fill required
Current elevation
Design elevation
Vertical difference
Before relying on cut-and-fill information, verify:
Pole height
Vertical datum
Geoid model
Site localization
Benchmark level
Design units
A vertical setup error can cause every cut-and-fill value to be wrong by a similar amount.
Using IMU Tilt During Stakeout
The T10 Pro supports IMU tilt measurement up to approximately 60°.
This can help when the pole cannot be held vertically because of:
A wall
Excavation
Barrier
Vehicle
Construction material
Slope
Restricted standing position
The pole tip must remain exactly on the point being measured.
For critical stakeout, use a vertical pole or perform an independent check whenever practical.
IMU tilt improves accessibility, but it does not correct an incorrect project setup or unstable pole tip.
Stakeout Near Buildings
GNSS performance may become less reliable near:
High-rise buildings
Metal roofs
Retaining walls
Containers
Heavy machinery
Dense trees
Possible warning signs include:
Slow initialization
Frequent Fixed-to-Float changes
Inconsistent repeated positions
Poor satellite geometry
Sudden coordinate movement
Unstable elevation
When the satellite environment is unsuitable, move control to a better location or use a Total Station.
RTK Versus Total Station for Stakeout
Use RTK When:
The work is outdoors
The sky is sufficiently visible
Points are widely distributed
Direct coordinates are available
Earthwork or civil accuracy is suitable
One-person operation is beneficial
Continuous line of sight is difficult
Use a Total Station When:
Working indoors
Setting out precise structural grids
Working below roofs or bridges
Satellite visibility is poor
Verticality or alignment checking is required
Points are close to buildings
Project tolerances are tighter than the demonstrated RTK performance
Many construction teams use RTK and a Total Station together.
RTK handles broad external positioning, while the Total Station supports precise structural and obstructed-site work.
T10 Pro with TOKNAV TBase
The TOKNAV TBase can provide an independent UHF correction source for the T10 Pro.
Relevant TBase specifications include:
1,408 GNSS channels
410–470 MHz UHF
Selectable 1W, 2W and 5W radio power
13,800mAh battery
More than 12 hours of stated Base operation at 5W
IP68 protection
32GB internal storage
A local Base may be useful when:
Mobile coverage is weak
CORS service is unavailable
The project requires independent operation
Verified project control is available
The Base can be installed securely
The Base coordinates must be established correctly. A Base configured with the wrong position can shift every staked point.
Using Network RTK
Network RTK may be more convenient when:
Mobile coverage is stable
A compatible service covers the project
The operator moves between multiple sites
Quick setup is required
Installing a Base is impractical
Before relying on network corrections, test:
SIM card
Mobile data
NTRIP credentials
Server address
Port number
Mountpoint
Correction-data age
Site coverage
Always verify the result against known project control.
Common Construction Stakeout Errors
Wrong Coordinate System
The design file and field project use different datums, projections or zones.
Incorrect Base Coordinates
Every Rover position is shifted because the Base was started with the wrong coordinate.
Wrong Pole Height
The recorded or staked elevation is incorrect because the physical pole height and software entry do not match.
Measuring in Float Mode
The point is marked without confirming a stable Fixed solution.
Incorrect Drawing Revision
The operator stakes coordinates from an outdated design.
Left-and-Right Confusion
Offsets are interpreted from the wrong alignment direction.
Missing Control Check
Work begins without verifying the system on an independent known point.
Poor Satellite Environment
Points are accepted close to buildings or trees despite unstable results.
No As-Staked Record
The physical mark is placed, but the actual measured coordinate is not stored.
Excessive Reliance on One Method
Critical points are not checked independently with another observation or instrument.
Daily Stakeout Quality-Control Checklist
Before work:
Confirm the current design revision
Check the coordinate system
Verify the correction source
Enter the correct pole height
Measure a known control point
Confirm Fixed status
Check correction-data age
During work:
Monitor solution quality
Repeat important points
Record as-staked coordinates
Use clear point descriptions
Protect survey marks
Report unexpected discrepancies
Before leaving:
Remeasure a control point
Back up the project
Export the day’s measurements
Confirm all required points were completed
Record unresolved site issues
When to Choose the TOKNAV T50 Instead
Choose the TOKNAV T10 Pro when:
Most stakeout points are physically accessible
Conventional pole positioning is practical
IMU tilt solves the main obstructions
Standard construction stakeout is the priority
A more economical RTK Rover is preferred
Consider the TOKNAV T50 when:
Inaccessible points occur regularly
Drain and trench work is common
Green-laser measurement is required
AR stakeout is valuable
The receiver will support more specialised site applications
The correct choice depends on the actual work rather than the highest specification alone.
TOKNAV Construction Stakeout RTK Supplier in Malaysia
Contact MTM Precision for the TOKNAV T10 Pro, T50, TBase, PCR100T and tSurvey software, including RTK package configuration, quotation, demonstration and technical discussion in Malaysia.
MTM Precision Sdn. Bhd. (744811-A)
Telephone: +603-8080 7172
WhatsApp: +6016-660 7346
Email: mtmpre@yahoo.com / enquiry@mtmpre.com.my
Website: www.mtmpre.com.my
Showroom & Service Centre:
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia.
18 Sep 2026