4-20 mA Endpoints Correct but Midpoint Reading Is Wrong - Troubleshooting Malaysia

4-20 mA Endpoints Correct but Midpoint Reading Is Wrong - Troubleshooting Malaysia

 

Your 4-20 mA system appears correct at both ends.

 

At 4 mA, the PLC displays the correct minimum value.

 

At 20 mA, the PLC displays the correct maximum value.

 

But at 12 mA, the midpoint is wrong.

 

What does this mean?

 

Many technicians check only 4 mA and 20 mA during troubleshooting. However, correct endpoints do not always prove that every part of the signal chain is behaving as expected.

 

Testing intermediate points such as 8 mA, 12 mA and 16 mA can reveal problems involving PLC scaling, custom calculations, signal linearization, HMI processing or control logic.

 

For suitable applications, the FNIRSI SG-003A Signal Generator can provide known test signals to help technicians investigate these problems.

 

What Should a Linear 4-20 mA Signal Look Like?

 

For a standard linear 0-100% relationship:

 

4 mA = 0%

 

8 mA = 25%

 

12 mA = 50%

 

16 mA = 75%

 

20 mA = 100%

 

This relationship is important.

 

If the system is intended to be linear, a 12 mA input should represent the midpoint of the configured engineering range.

 

Example: 0-10 Bar Pressure Range

 

Suppose:

 

4-20 mA = 0-10 bar

 

Expected values are:

 

4 mA = 0 bar

 

8 mA = 2.5 bar

 

12 mA = 5 bar

 

16 mA = 7.5 bar

 

20 mA = 10 bar

 

Now imagine the PLC displays:

 

4 mA = 0 bar

 

8 mA = 1.8 bar

 

12 mA = 4.0 bar

 

16 mA = 7.0 bar

 

20 mA = 10 bar

 

Both endpoints are correct.

 

But the intermediate values are not following the expected linear relationship.

 

This tells you that more investigation is required.

 

Why Endpoint Testing Alone Can Miss Problems

 

If you test only:

 

4 mA

 

and

 

20 mA

 

you are checking only two points.

 

A calculation can still produce the correct values at both endpoints while producing incorrect values between them.

 

This is particularly important when the PLC program contains:

 

Custom calculations

 

Lookup tables

 

Linearization

 

Piecewise scaling

 

Correction factors

 

Special process logic

 

Intermediate testing gives a clearer picture of system behaviour.

 

Problem 1: Incorrect PLC Scaling Formula

 

A PLC programmer may use a custom mathematical formula to convert the analog input into engineering units.

 

If that formula contains an error, the endpoints may sometimes appear correct while intermediate values are wrong.

 

Check:

 

Raw analog value

 

Scaling formula

 

Constants

 

Offsets

 

Multiplication factors

 

Division factors

 

Do not assume that the scaling block is correct simply because 4 mA and 20 mA look right.

 

Problem 2: Non-Linear Processing in the PLC

 

Not every process signal is intended to be displayed linearly.

 

The PLC may intentionally apply:

 

Square-root extraction

 

Lookup tables

 

Curve correction

 

Tank-volume calculations

 

Sensor linearization

 

Custom engineering formulas

 

If so, 12 mA may not necessarily correspond to 50% of the final displayed variable.

 

Before diagnosing a fault, understand what the PLC program is supposed to calculate.

 

Example: Tank Level vs Tank Volume

 

This is an important example.

 

Imagine a transmitter measures liquid level.

 

The transmitter output may be linear with level:

 

4 mA = 0% level

 

12 mA = 50% level

 

20 mA = 100% level

 

But the HMI displays tank volume, not level.

 

If the tank shape is non-linear, 50% liquid height may not equal exactly 50% of total volume.

 

Therefore:

 

12 mA = 50% level

 

does not automatically mean:

 

12 mA = 50% volume

 

Always identify what the HMI is actually displaying.

 

Problem 3: HMI Applies Additional Processing

 

The PLC value may be correct while the HMI modifies it.

 

Possible HMI functions include:

 

Additional scaling

 

Unit conversion

 

Offset

 

Multiplication

 

Decimal adjustment

 

Custom expression

 

Compare the PLC engineering value directly with the HMI value.

 

If the PLC shows the correct midpoint but the HMI does not, the problem is probably downstream of the analog input.

 

Problem 4: Wrong Raw Input Conversion

 

PLC manufacturers may represent analog signals using different raw numerical ranges.

 

The program must correctly convert the module's raw value into engineering units.

 

If the programmer assumes the wrong raw range, scaling can be incorrect.

 

Check the documentation for the exact PLC analog input module.

 

Do not copy a scaling formula from a different PLC model without confirming that the raw input representation is the same.

 

Problem 5: Old Correction Values Remain in the Program

 

Sometimes maintenance teams add correction factors to compensate for a previous sensor or process condition.

 

Later, the transmitter is replaced but the old correction remains in the PLC.

 

For example:

 

Displayed Value = Scaled Value + Correction

 

or

 

Displayed Value = Scaled Value x Correction Factor

 

This may cause unexpected readings.

 

Review the PLC logic if the electrical input appears correct.

 

Problem 6: Transmitter and PLC Use Different Engineering Ranges

 

Consider a transmitter configured as:

 

0-16 bar = 4-20 mA

 

while the PLC program assumes:

 

0-10 bar = 4-20 mA

 

Normally this will also affect the upper endpoint.

 

However, additional software limits or clamping may make the problem less obvious.

 

For example, the HMI may be programmed not to display above 10 bar.

 

Always compare the actual transmitter configuration with the PLC engineering range.

 

Why 12 mA Is a Useful Test Point

 

For a standard linear 4-20 mA range:

 

12 mA = 50%

 

This makes 12 mA one of the easiest troubleshooting points.

 

Examples:

 

For 0-10 bar:

 

12 mA = 5 bar

 

For 0-100掳C:

 

12 mA = 50掳C

 

For 0-5 m tank level:

 

12 mA = 2.5 m

 

For 0-100%:

 

12 mA = 50%

 

If the system is supposed to be linear and these midpoint values are wrong, investigate the scaling and processing.

 

Why 8 mA and 16 mA Are Also Useful

 

Testing only 12 mA gives you one intermediate point.

 

Adding:

 

8 mA = 25%

 

and

 

16 mA = 75%

 

provides a better picture.

 

A useful functional test sequence is:

 

4 mA = 0%

 

8 mA = 25%

 

12 mA = 50%

 

16 mA = 75%

 

20 mA = 100%

 

Record both the expected and actual values.

 

Patterns in the error can help identify the problem.

 

Example: Temperature Transmitter

 

Suppose a temperature system is configured as:

 

0-200掳C = 4-20 mA

 

Expected:

 

4 mA = 0掳C

 

8 mA = 50掳C

 

12 mA = 100掳C

 

16 mA = 150掳C

 

20 mA = 200掳C

 

But the HMI shows:

 

4 mA = 0掳C

 

8 mA = 40掳C

 

12 mA = 90掳C

 

16 mA = 145掳C

 

20 mA = 200掳C

 

This is not the expected linear response.

 

Check whether the HMI is displaying the directly scaled transmitter signal or another calculated process value.

 

Check the Raw PLC Value First

 

When troubleshooting this type of problem, divide the system into stages.

 

Stage 1: Test Signal

 

Is the known test signal correct?

 

Stage 2: PLC Raw Input

 

Does the raw PLC value change consistently?

 

Stage 3: PLC Engineering Value

 

Does the PLC scaling produce the expected engineering value?

 

Stage 4: HMI

 

Does the HMI display the same correct value?

 

This helps locate where the error begins.

 

How the FNIRSI SG-003A Helps

 

For suitable applications, the FNIRSI SG-003A can provide known test signals so technicians can compare expected and actual system response.

 

Instead of relying on an operating process, technicians can check defined points such as:

 

4 mA

 

8 mA

 

12 mA

 

16 mA

 

20 mA

 

This is particularly useful during:

 

PLC commissioning

 

Control-panel testing

 

Scaling troubleshooting

 

HMI troubleshooting

 

Loop checking

 

Factory maintenance

 

Do Not Assume Every Process Is Linear

 

This is an important limitation.

 

A 4-20 mA electrical signal may be linear, but the final process calculation may not be.

 

Examples may include:

 

Flow calculations

 

Tank volume calculations

 

Special sensor curves

 

Square-root processing

 

Custom process equations

 

Therefore, before saying the midpoint is "wrong", confirm what the system is designed to display.

 

Functional Check vs Calibration

 

Applying several known signals and observing the PLC response is useful for functional testing and troubleshooting.

 

It is not automatically equivalent to formal calibration.

 

Formal calibration may require:

 

Specified accuracy

 

Traceable reference equipment

 

Measurement uncertainty

 

Documented procedures

 

Calibration records

 

Certificates

 

Choose the test equipment according to the required job.

 

Important Safety Reminder

 

Before applying a test signal:

 

Confirm the correct signal type

 

Check the PLC input specification

 

Identify the correct terminals

 

Check polarity

 

Understand the loop power arrangement

 

Confirm the permitted signal range

 

Review PLC logic

 

Determine what equipment may respond

 

Follow site isolation and safety procedures

 

A simulated analog value can potentially affect pumps, motors, valves, alarms and interlocks.

 

Looking for FNIRSI SG-003A in Malaysia?

 

MTM Precision Sdn Bhd supplies the FNIRSI SG-003A Signal Generator in Malaysia for PLC troubleshooting, 4-20 mA testing, control-panel commissioning and industrial maintenance applications.

 

If your 4 mA and 20 mA readings are correct but the midpoint is wrong, send us a photo of your PLC analog input module, transmitter range, HMI reading or wiring diagram through WhatsApp.

 

We can help evaluate the application and suitable test method.

 

MTM Precision Sdn Bhd

 

Showroom & Service Centre

No 29-1 & 2, Jalan Bandar 18,

Pusat Bandar Puchong,

47160 Puchong, Selangor, Malaysia

 

Tel: 03-8080 7172

WhatsApp: +6016-660 7346

Email: mtmpre@yahoo.com

Website: www.mtmpre.com.my

 

Serving customers across Selangor, Kuala Lumpur, Johor, Penang, Melaka, Negeri Sembilan, Perak, Pahang, Kelantan, Terengganu, Kedah, Perlis, Sabah and Sarawak.


 

04 Oct 2026