Anchor Pull-Out Test Method Statement – What Should Be Included? Malaysia
Anchor Pull-Out Test Method Statement – What Should Be Included? Malaysia
Anchor Pull-Out Test Method Statement Guide Malaysia
An Anchor Pull-Out Test Method Statement should clearly explain how anchor testing will be prepared, performed, recorded and evaluated on a construction project.
A good method statement should not simply say:
“Install pull-out tester and apply load.”
It should define important information such as:
Scope of testing
Anchor identification
Test equipment
Required test load
Testing procedure
Acceptance criteria
Safety requirements
Reporting
Action after a failed test
The final method statement should always be prepared and approved according to the specific project's engineering requirements.
For suitable field applications, equipment such as the Langry APT200 Anchor Pull-Out Tester can provide controlled tensile force measurement up to 200kN.
Important: There Is No One Method Statement for Every Project
Anchor testing requirements vary.
A method statement used for one curtain wall project should not automatically be copied into another project without review.
Differences can include:
Anchor type
Anchor size
Base material
Required test load
Test quantity
Proof or destructive testing
Acceptance criteria
Site conditions
The method statement must match the actual project.
1. Project Information
The document should begin with basic project information.
This may include:
Project name
Project location
Main contractor
Subcontractor
Consultant
Testing company
Relevant work package
Document reference
Revision
Good document control is especially important when procedures are revised.
2. Purpose of the Anchor Pull-Out Test
The method statement should clearly explain why the testing is being performed.
For example, the objective may be to verify selected installed anchors against a specified proof load as part of project QA/QC.
Do not leave the test objective ambiguous.
3. Define the Scope
The scope should identify what is included.
For example:
Chemical anchor testing
Mechanical anchor testing
Expansion anchor testing
Façade anchor testing
Structural fixing testing
Selected post-installed anchor testing
The scope may also define which areas or work packages are covered.
4. Identify the Anchor System
Record relevant anchor information such as:
Anchor type
Manufacturer where applicable
Product/system
Diameter
Thread size
Embedment
Base material
Installation application
This helps ensure the testing procedure refers to the correct anchoring system.
5. Define the Test Objective
The method statement should distinguish between:
Proof Load Testing
The anchor is loaded to a specified level according to an approved procedure without intentionally loading it to ultimate failure.
Ultimate or Failure Testing
The test may continue toward a defined failure condition according to the applicable test method.
These are different objectives and should not be confused.
6. Define the Test Quantity
The method statement should state how many anchors will be tested or refer clearly to the approved sampling requirement.
Do not invent a universal percentage.
The required quantity may come from:
Project specification
Consultant requirement
Engineer requirement
Approved sampling plan
Applicable testing procedure
7. Define How Test Points Are Selected
For larger projects, test locations should not be ambiguous.
The method statement may explain how anchors are selected according to:
Floor
Grid
Elevation
Installation zone
Anchor type
Installation batch
Other approved criteria
Every tested anchor should be identifiable.
8. Anchor Identification
Each test point should have a unique ID.
For example:
APT-L15-G6-03
The project's own numbering system can be used.
The important requirement is traceability between:
Physical Anchor → Test Reading → Photograph → Final Report
9. Define the Required Test Load
This is one of the most important parts of the document.
The method statement should state the approved target load or identify the document from which it is obtained.
The load should not be chosen by the test operator based only on equipment capacity.
For example:
Tester capacity: 200kN
does not mean:
Required test load: 200kN
10. Identify Who Provides the Test Load
The method statement may reference the appropriate source of the requirement, such as:
Structural engineer
Façade engineer
Consultant
Project specification
Approved design
Approved test procedure
This reduces confusion at the site.
11. Define Loading Stages
If the approved procedure requires staged loading, the method statement should describe it.
Do not create arbitrary loading increments.
Use the approved procedure applicable to the project.
12. Define Holding Time
Where the anchor must be held at a specified load, record:
Required load
Holding duration
What is monitored during the holding period
This should be established before testing begins.
13. Define Movement Measurement Where Required
Some procedures may require displacement or movement to be monitored.
If required, the method statement should identify:
Measurement method
Instrument
Measurement points
Recording procedure
Acceptance criteria
A force reading alone may not satisfy every project requirement.
14. Define the Acceptance Criteria
The method statement must make clear how the result will be assessed.
Depending on the approved project requirements, acceptance may consider:
Required proof load achieved
Load maintained
Movement within specified limits
No unacceptable visible damage
Other defined criteria
The test operator should not invent pass/fail criteria at the site.
15. List the Test Equipment
The method statement should identify the equipment to be used.
For example:
Anchor Pull-Out Tester
Manufacturer: Langry
Model: APT200
Measurement Range: 0–200kN
Additional equipment may include:
Hydraulic pump
Hydraulic cylinder
Pull rod
Converters
Adapters
Reaction accessories
Measurement equipment where required
16. Confirm Equipment Capacity
The tester must have sufficient capacity for the required load.
Langry offers several ranges:
ModelMaximum RangeApproximate ClassAPT100100kN10 TonAPT200200kN20 TonAPT300300kN30 Ton
If the project requires 150kN, a 100kN tester is insufficient.
17. Include Equipment Calibration Requirements
Where required, the method statement should identify calibration or traceability requirements.
The project may require:
Equipment serial number
Calibration certificate
Calibration date
Calibration validity
Traceability information
These documents should be checked before mobilisation.
18. Describe the Adapter Connection
The tester must connect securely to the anchor.
The method statement should address the appropriate connection arrangement.
Depending on the application, this can involve:
Pull rod
Threaded adapter
Converter
Coupler
Special fixture
The connection must be appropriate for the expected load.
19. Describe the Reaction Setup
The hydraulic cylinder requires a stable reaction arrangement.
The procedure should consider:
Concrete surface
Anchor location
Edge condition
Nearby anchors
Surrounding bracket
Available clearance
A poor reaction setup can influence the test.
20. Address Pulling Alignment
The tensile load should generally be applied as axially as practical.
Poor alignment can introduce:
Bending
Side loading
Uneven force
Equipment instability
The method statement should require appropriate positioning of the test equipment.
21. Include Pre-Test Inspection
Before applying load, the operator should inspect the test point.
Checks may include:
Correct anchor ID
Anchor condition
Exposed thread
Adapter engagement
Tester alignment
Reaction arrangement
Surrounding concrete
Safe working area
Any abnormal condition should be documented.
22. Include Chemical Anchor Curing Checks
For chemical anchors, confirm that the required curing conditions have been achieved before testing.
Relevant information may include:
Installation date
Installation time
Anchor product
Applicable curing requirement
Relevant temperature conditions
Testing should not begin simply because the site is ready.
23. Describe the Testing Sequence
A general method statement structure may include:
Confirm anchor identification
Inspect test location
Install suitable adapter
Position the hydraulic cylinder
Confirm reaction arrangement
Zero/check the measurement system
Apply load according to the approved procedure
Reach the specified target
Hold where required
Record measurements and observations
Release load safely
Inspect anchor after testing
Photograph and document the result
The actual loading sequence must follow the approved project procedure.
24. Define What Happens If an Anchor Fails
Do not wait until the first failure to ask what to do.
The method statement should address the project's failure procedure.
This may involve:
Stop testing
Record the result
Photograph the failure
Inform responsible personnel
Investigate installation
Perform additional testing if instructed
Implement corrective action
The exact response should follow the project requirements.
25. Include Safety Requirements
Anchor pull-out testing can involve substantial stored energy and high tensile force.
Safety controls may include:
Controlled test area
Appropriate PPE
Secure adapters
Stable reaction setup
Safe operator position
Equipment inspection
Controlled hydraulic loading
Controlled pressure release
Personnel should avoid unnecessary positioning in the potential failure path.
26. Working at Height
For façade or elevated testing, additional controls may be required.
Consider:
Scaffolding
Work platforms
Fall protection
Equipment handling
Tool securing
Access permits
These requirements should align with the project's site safety procedures.
27. Define Personnel Responsibilities
The method statement may identify responsibilities for:
Test operator
QA/QC representative
Main contractor
Subcontractor
Consultant/witness where required
Safety personnel
Clear responsibilities reduce site confusion.
28. Include Test Documentation
The operator should record relevant information during testing.
This may include:
Anchor ID
Location
Anchor type
Size
Required load
Applied load
Holding time
Movement where required
Observations
Result
Equipment ID
Date
Operator
29. Include Photographic Records
Useful photographs may include:
Test location
Anchor identification
Tester setup
Force reading
Anchor after testing
Failure condition where applicable
Photographs should be traceable to the relevant anchor ID.
30. Define the Final Test Report
The method statement should explain how results will be presented.
A professional report may contain:
Project details
Testing scope
Test procedure
Equipment details
Calibration information where required
Anchor schedule
Individual test results
Observations
Photographs
Pass/fail status according to approved criteria
Signatures or approvals where required
Example Method Statement Structure
A professional document can be organised as:
1. Purpose
2. Scope
3. References
4. Definitions
5. Responsibilities
6. Equipment
7. Anchor Information
8. Pre-Test Requirements
9. Test Procedure
10. Acceptance Criteria
11. Failure Procedure
12. Safety Requirements
13. Test Records
14. Reporting
15. Attachments
This provides a useful framework without assuming that every project uses the same test procedure.
Langry APT200 for Anchor Pull-Out Testing
The Langry APT200 provides:
Measurement Range: 0–200kN
Approximate Capacity: 20 Ton
Key specifications include:
SpecificationLangry APT200Measurement Range0–200kNCylinder Centre Hole35mmCylinder Stroke70mmCylinder WeightApprox. 13kgCommon AnchorageΦ6–Φ25Pull RodM24ConverterM6–M22Data Storage500 RecordsContinuous Working Time>200 HoursAccuracy ClassificationEN ISO 7500-1 Class 1
Actual suitability depends on the project's required load, anchor configuration and test method.
Common Method Statement Mistakes
No Test Load
“Perform pull-out test” is not enough.
The required load must be defined or referenced.
No Acceptance Criteria
The operator needs to know what constitutes pass or fail.
No Anchor Identification
Results become difficult to trace.
No Failure Procedure
The team does not know what to do when a test fails.
Wrong Equipment Capacity
The tester must cover the required testing range.
No Calibration Check
Required documentation may be discovered missing only after arriving on site.
No Site Access Planning
This is particularly problematic for façade testing.
Frequently Asked Questions
What should an anchor pull-out test method statement include?
It should define the scope, anchor information, equipment, required load, test procedure, acceptance criteria, safety requirements, failure procedure and reporting requirements.
Who should approve the method statement?
This depends on the project management and contractual structure. Follow the project's required submission and approval process.
Can I copy a method statement from another project?
It may be used as a structural reference, but the technical requirements must be reviewed and adapted to the actual project.
Should the required test load be stated?
Yes, or the method statement should clearly reference the approved document that defines it.
Should calibration information be included?
Where required by the project, equipment identification and relevant calibration information should be documented.
Should the method statement define pass/fail criteria?
Yes. The test result should be assessed against defined project criteria rather than an operator's opinion.
Can Langry APT200 be used for anchor proof testing?
It can be used for suitable professional anchor testing applications where the required test load and configuration fall within its 200kN measurement range.
Where can I buy an anchor pull-out tester in Malaysia?
Contact MTM Precision Sdn. Bhd. for Langry anchor pull-out testing equipment, model selection and current quotation in Malaysia.
Anchor Pull-Out Testing Equipment Supplier Malaysia
MTM Precision supplies professional construction and civil engineering testing instruments for:
Contractors
QA/QC teams
Façade contractors
Structural contractors
Inspection companies
Testing laboratories
For equipment selection, provide:
Anchor Type + Anchor Diameter + Required Test Load + Test Application
For unusual test configurations, photographs and dimensions are also useful.
Contact MTM Precision
MTM Precision Sdn. Bhd.
Showroom & Service Centre
No. 29-1 & 29-2, Jalan Bandar 18,
Pusat Bandar Puchong,
47160 Puchong, Selangor, Malaysia
🌐 Website: www.mtmpre.com.my
📧 Email: mtmpre@yahoo.com
📱 WhatsApp: +6016-660 7346
For Langry APT200 Anchor Pull-Out Tester Malaysia, model selection, current quotation and professional construction testing equipment enquiries, contact MTM Precision.
11 Aug 2026