Anchor Pull-Out Test Method Statement – What Should Be Included? Malaysia

Anchor Pull-Out Test Method Statement – What Should Be Included? Malaysia


Anchor Pull-Out Test Method Statement Guide Malaysia


An Anchor Pull-Out Test Method Statement should clearly explain how anchor testing will be prepared, performed, recorded and evaluated on a construction project.


A good method statement should not simply say:


“Install pull-out tester and apply load.”


It should define important information such as:


Scope of testing


Anchor identification


Test equipment


Required test load


Testing procedure


Acceptance criteria


Safety requirements


Reporting


Action after a failed test


The final method statement should always be prepared and approved according to the specific project's engineering requirements.


For suitable field applications, equipment such as the Langry APT200 Anchor Pull-Out Tester can provide controlled tensile force measurement up to 200kN.


Important: There Is No One Method Statement for Every Project


Anchor testing requirements vary.


A method statement used for one curtain wall project should not automatically be copied into another project without review.


Differences can include:


Anchor type


Anchor size


Base material


Required test load


Test quantity


Proof or destructive testing


Acceptance criteria


Site conditions


The method statement must match the actual project.


1. Project Information


The document should begin with basic project information.


This may include:


Project name


Project location


Main contractor


Subcontractor


Consultant


Testing company


Relevant work package


Document reference


Revision


Good document control is especially important when procedures are revised.


2. Purpose of the Anchor Pull-Out Test


The method statement should clearly explain why the testing is being performed.


For example, the objective may be to verify selected installed anchors against a specified proof load as part of project QA/QC.


Do not leave the test objective ambiguous.


3. Define the Scope


The scope should identify what is included.


For example:


Chemical anchor testing


Mechanical anchor testing


Expansion anchor testing


Façade anchor testing


Structural fixing testing


Selected post-installed anchor testing


The scope may also define which areas or work packages are covered.


4. Identify the Anchor System


Record relevant anchor information such as:


Anchor type


Manufacturer where applicable


Product/system


Diameter


Thread size


Embedment


Base material


Installation application


This helps ensure the testing procedure refers to the correct anchoring system.


5. Define the Test Objective


The method statement should distinguish between:


Proof Load Testing


The anchor is loaded to a specified level according to an approved procedure without intentionally loading it to ultimate failure.


Ultimate or Failure Testing


The test may continue toward a defined failure condition according to the applicable test method.


These are different objectives and should not be confused.


6. Define the Test Quantity


The method statement should state how many anchors will be tested or refer clearly to the approved sampling requirement.


Do not invent a universal percentage.


The required quantity may come from:


Project specification


Consultant requirement


Engineer requirement


Approved sampling plan


Applicable testing procedure


7. Define How Test Points Are Selected


For larger projects, test locations should not be ambiguous.


The method statement may explain how anchors are selected according to:


Floor


Grid


Elevation


Installation zone


Anchor type


Installation batch


Other approved criteria


Every tested anchor should be identifiable.


8. Anchor Identification


Each test point should have a unique ID.


For example:


APT-L15-G6-03


The project's own numbering system can be used.


The important requirement is traceability between:


Physical Anchor → Test Reading → Photograph → Final Report


9. Define the Required Test Load


This is one of the most important parts of the document.


The method statement should state the approved target load or identify the document from which it is obtained.


The load should not be chosen by the test operator based only on equipment capacity.


For example:


Tester capacity: 200kN


does not mean:


Required test load: 200kN


10. Identify Who Provides the Test Load


The method statement may reference the appropriate source of the requirement, such as:


Structural engineer


Façade engineer


Consultant


Project specification


Approved design


Approved test procedure


This reduces confusion at the site.


11. Define Loading Stages


If the approved procedure requires staged loading, the method statement should describe it.


Do not create arbitrary loading increments.


Use the approved procedure applicable to the project.


12. Define Holding Time


Where the anchor must be held at a specified load, record:


Required load


Holding duration


What is monitored during the holding period


This should be established before testing begins.


13. Define Movement Measurement Where Required


Some procedures may require displacement or movement to be monitored.


If required, the method statement should identify:


Measurement method


Instrument


Measurement points


Recording procedure


Acceptance criteria


A force reading alone may not satisfy every project requirement.


14. Define the Acceptance Criteria


The method statement must make clear how the result will be assessed.


Depending on the approved project requirements, acceptance may consider:


Required proof load achieved


Load maintained


Movement within specified limits


No unacceptable visible damage


Other defined criteria


The test operator should not invent pass/fail criteria at the site.


15. List the Test Equipment


The method statement should identify the equipment to be used.


For example:


Anchor Pull-Out Tester


Manufacturer: Langry


Model: APT200


Measurement Range: 0–200kN


Additional equipment may include:


Hydraulic pump


Hydraulic cylinder


Pull rod


Converters


Adapters


Reaction accessories


Measurement equipment where required


16. Confirm Equipment Capacity


The tester must have sufficient capacity for the required load.


Langry offers several ranges:


ModelMaximum RangeApproximate ClassAPT100100kN10 TonAPT200200kN20 TonAPT300300kN30 Ton


If the project requires 150kN, a 100kN tester is insufficient.


17. Include Equipment Calibration Requirements


Where required, the method statement should identify calibration or traceability requirements.


The project may require:


Equipment serial number


Calibration certificate


Calibration date


Calibration validity


Traceability information


These documents should be checked before mobilisation.


18. Describe the Adapter Connection


The tester must connect securely to the anchor.


The method statement should address the appropriate connection arrangement.


Depending on the application, this can involve:


Pull rod


Threaded adapter


Converter


Coupler


Special fixture


The connection must be appropriate for the expected load.


19. Describe the Reaction Setup


The hydraulic cylinder requires a stable reaction arrangement.


The procedure should consider:


Concrete surface


Anchor location


Edge condition


Nearby anchors


Surrounding bracket


Available clearance


A poor reaction setup can influence the test.


20. Address Pulling Alignment


The tensile load should generally be applied as axially as practical.


Poor alignment can introduce:


Bending


Side loading


Uneven force


Equipment instability


The method statement should require appropriate positioning of the test equipment.


21. Include Pre-Test Inspection


Before applying load, the operator should inspect the test point.


Checks may include:


Correct anchor ID


Anchor condition


Exposed thread


Adapter engagement


Tester alignment


Reaction arrangement


Surrounding concrete


Safe working area


Any abnormal condition should be documented.


22. Include Chemical Anchor Curing Checks


For chemical anchors, confirm that the required curing conditions have been achieved before testing.


Relevant information may include:


Installation date


Installation time


Anchor product


Applicable curing requirement


Relevant temperature conditions


Testing should not begin simply because the site is ready.


23. Describe the Testing Sequence


A general method statement structure may include:


Confirm anchor identification


Inspect test location


Install suitable adapter


Position the hydraulic cylinder


Confirm reaction arrangement


Zero/check the measurement system


Apply load according to the approved procedure


Reach the specified target


Hold where required


Record measurements and observations


Release load safely


Inspect anchor after testing


Photograph and document the result


The actual loading sequence must follow the approved project procedure.


24. Define What Happens If an Anchor Fails


Do not wait until the first failure to ask what to do.


The method statement should address the project's failure procedure.


This may involve:


Stop testing


Record the result


Photograph the failure


Inform responsible personnel


Investigate installation


Perform additional testing if instructed


Implement corrective action


The exact response should follow the project requirements.


25. Include Safety Requirements


Anchor pull-out testing can involve substantial stored energy and high tensile force.


Safety controls may include:


Controlled test area


Appropriate PPE


Secure adapters


Stable reaction setup


Safe operator position


Equipment inspection


Controlled hydraulic loading


Controlled pressure release


Personnel should avoid unnecessary positioning in the potential failure path.


26. Working at Height


For façade or elevated testing, additional controls may be required.


Consider:


Scaffolding


Work platforms


Fall protection


Equipment handling


Tool securing


Access permits


These requirements should align with the project's site safety procedures.


27. Define Personnel Responsibilities


The method statement may identify responsibilities for:


Test operator


QA/QC representative


Main contractor


Subcontractor


Consultant/witness where required


Safety personnel


Clear responsibilities reduce site confusion.


28. Include Test Documentation


The operator should record relevant information during testing.


This may include:


Anchor ID


Location


Anchor type


Size


Required load


Applied load


Holding time


Movement where required


Observations


Result


Equipment ID


Date


Operator


29. Include Photographic Records


Useful photographs may include:


Test location


Anchor identification


Tester setup


Force reading


Anchor after testing


Failure condition where applicable


Photographs should be traceable to the relevant anchor ID.


30. Define the Final Test Report


The method statement should explain how results will be presented.


A professional report may contain:


Project details


Testing scope


Test procedure


Equipment details


Calibration information where required


Anchor schedule


Individual test results


Observations


Photographs


Pass/fail status according to approved criteria


Signatures or approvals where required


Example Method Statement Structure


A professional document can be organised as:


1. Purpose


2. Scope


3. References


4. Definitions


5. Responsibilities


6. Equipment


7. Anchor Information


8. Pre-Test Requirements


9. Test Procedure


10. Acceptance Criteria


11. Failure Procedure


12. Safety Requirements


13. Test Records


14. Reporting


15. Attachments


This provides a useful framework without assuming that every project uses the same test procedure.


Langry APT200 for Anchor Pull-Out Testing


The Langry APT200 provides:


Measurement Range: 0–200kN


Approximate Capacity: 20 Ton


Key specifications include:


SpecificationLangry APT200Measurement Range0–200kNCylinder Centre Hole35mmCylinder Stroke70mmCylinder WeightApprox. 13kgCommon AnchorageΦ6–Φ25Pull RodM24ConverterM6–M22Data Storage500 RecordsContinuous Working Time>200 HoursAccuracy ClassificationEN ISO 7500-1 Class 1


Actual suitability depends on the project's required load, anchor configuration and test method.


Common Method Statement Mistakes


No Test Load


“Perform pull-out test” is not enough.


The required load must be defined or referenced.


No Acceptance Criteria


The operator needs to know what constitutes pass or fail.


No Anchor Identification


Results become difficult to trace.


No Failure Procedure


The team does not know what to do when a test fails.


Wrong Equipment Capacity


The tester must cover the required testing range.


No Calibration Check


Required documentation may be discovered missing only after arriving on site.


No Site Access Planning


This is particularly problematic for façade testing.


Frequently Asked Questions


What should an anchor pull-out test method statement include?


It should define the scope, anchor information, equipment, required load, test procedure, acceptance criteria, safety requirements, failure procedure and reporting requirements.


Who should approve the method statement?


This depends on the project management and contractual structure. Follow the project's required submission and approval process.


Can I copy a method statement from another project?


It may be used as a structural reference, but the technical requirements must be reviewed and adapted to the actual project.


Should the required test load be stated?


Yes, or the method statement should clearly reference the approved document that defines it.


Should calibration information be included?


Where required by the project, equipment identification and relevant calibration information should be documented.


Should the method statement define pass/fail criteria?


Yes. The test result should be assessed against defined project criteria rather than an operator's opinion.


Can Langry APT200 be used for anchor proof testing?


It can be used for suitable professional anchor testing applications where the required test load and configuration fall within its 200kN measurement range.


Where can I buy an anchor pull-out tester in Malaysia?


Contact MTM Precision Sdn. Bhd. for Langry anchor pull-out testing equipment, model selection and current quotation in Malaysia.


Anchor Pull-Out Testing Equipment Supplier Malaysia


MTM Precision supplies professional construction and civil engineering testing instruments for:


Contractors


QA/QC teams


Façade contractors


Structural contractors


Inspection companies


Testing laboratories


For equipment selection, provide:


Anchor Type + Anchor Diameter + Required Test Load + Test Application


For unusual test configurations, photographs and dimensions are also useful.


Contact MTM Precision


MTM Precision Sdn. Bhd.


Showroom & Service Centre


No. 29-1 & 29-2, Jalan Bandar 18,

Pusat Bandar Puchong,

47160 Puchong, Selangor, Malaysia


🌐 Website: www.mtmpre.com.my

📧 Email: mtmpre@yahoo.com

📱 WhatsApp: +6016-660 7346


For Langry APT200 Anchor Pull-Out Tester Malaysia, model selection, current quotation and professional construction testing equipment enquiries, contact MTM Precision.



11 Aug 2026