Solar Irradiance Testing for PV Site Inspection with TENMARS TM-751 Malaysia

Solar Irradiance Testing for PV Site Inspection with TENMARS TM-751 Malaysia

 

Solar PV site inspection should not rely only on visual observation.

 

A rooftop may appear bright and sunny, but solar radiation can vary between different areas because of panel orientation, nearby structures, partial shading, cloud movement and the position of the sun.

 

The TENMARS TM-751 Solar Power Meter allows solar contractors and technicians to measure solar irradiance directly in W/m虏, providing useful field data during photovoltaic site inspection, installation and maintenance in Malaysia.

 

Why Measure Solar Irradiance During a PV Site Inspection?

 

Solar panels depend on incoming solar radiation.

 

Therefore, when inspecting a potential PV installation site, it is useful to understand the actual solar conditions at different locations.

 

A technician may need to answer questions such as:

 

Does one roof section receive more solar radiation than another?

 

Is a nearby building creating significant shading?

 

How does panel orientation affect incoming solar radiation?

 

Are existing panels receiving similar solar exposure?

 

Is low PV output occurring during strong or weak sunlight?

 

Does rooftop equipment create partial shading?

 

A portable solar power meter provides measurable information that can support these assessments.

 

TENMARS TM-751 Solar Power Measurement

 

The TENMARS TM-751 is designed for solar radiation measurement with a range of up to:

 

2000 W/m虏

 

and a resolution of:

 

0.1 W/m虏

 

It also provides an approximately 0.25-second sampling rate, allowing technicians to observe changes in solar radiation relatively quickly.

 

For field inspection, this makes it convenient to move between different measurement points and compare readings.

 

Site Inspection Example: Comparing Two Roof Areas

 

Consider a commercial building where a contractor is evaluating two potential areas for solar panel installation.

 

During similar sunlight conditions, the technician measures:

 

Roof Area A: 930 W/m虏

 

Roof Area B: 690 W/m虏

 

Further inspection shows that Roof Area B is partially affected by an adjacent building.

 

The solar irradiance measurements do not replace a complete shading study, but they provide immediate evidence that the two locations are experiencing different solar exposure at that particular time.

 

This information can support further site analysis.

 

Detecting Partial Shading

 

Shading is one of the important factors affecting photovoltaic installations.

 

Common sources of rooftop shading include:

 

Trees

 

Water tanks

 

Lift motor rooms

 

Parapet walls

 

HVAC equipment

 

Antennas

 

Signboards

 

Nearby buildings

 

Utility structures

 

Some shading problems are obvious.

 

Others may affect only a portion of the solar array or occur during particular times of the day.

 

By taking solar irradiance readings at different positions, technicians can identify differences in solar exposure and decide where more detailed investigation is required.

 

Measuring Near Existing Solar Panels

 

For an existing PV installation, the TM-751 can be positioned so that the sensor orientation is representative of the solar panel plane.

 

This provides an irradiance measurement that is more relevant to the radiation reaching the panel surface.

 

The technician can then record the W/m虏 reading together with system operating information.

 

For example:

 

Solar Irradiance: 915 W/m虏

Weather: Clear

Time: 1:20 PM

PV Array: South-facing roof section

Condition: No obvious shading

 

Recording information in this way creates more useful maintenance documentation than simply writing "weather sunny".

 

Why Irradiance Matters When Troubleshooting Low PV Output

 

Suppose a customer reports that a solar PV system is generating less power than expected.

 

The technician measures system output but does not measure solar irradiance.

 

There is an important missing piece of information.

 

Was the available sunlight strong enough at the time of testing?

 

Low PV output during weak solar radiation may be normal.

 

Low PV output during strong solar radiation may justify further investigation.

 

Possible causes could include:

 

Dirty solar panels

 

Partial shading

 

Module degradation

 

Damaged modules

 

Loose connections

 

Cable problems

 

Inverter issues

 

Electrical faults

 

System configuration problems

 

The TM-751 does not identify these faults directly.

 

Instead, it provides the solar irradiance reference needed to interpret the system measurements more meaningfully.

 

Solar Irradiance Should Be Recorded with Other Measurements

 

A good PV inspection may involve several types of measurements.

 

Depending on the scope of work, technicians may record:

 

Solar irradiance in W/m虏

 

Module temperature

 

Ambient temperature

 

DC voltage

 

DC current

 

AC voltage

 

AC current

 

Insulation resistance

 

System output

 

Visual condition

 

Shading condition

 

Solar irradiance is one part of the overall inspection data.

 

When combined with electrical and environmental measurements, it can help create a clearer picture of actual system conditions.

 

Comparing Different PV Arrays

 

Large commercial and industrial installations may contain multiple PV arrays.

 

Different arrays may experience different conditions because of:

 

Roof orientation

 

Panel tilt

 

Building geometry

 

Nearby obstacles

 

Localised shading

 

A technician can take solar irradiance measurements near different arrays under similar conditions.

 

For example:

 

Array A: 940 W/m虏

Array B: 925 W/m虏

Array C: 620 W/m虏

 

If Array C is also showing lower electrical output, the reduced solar exposure becomes an important factor to consider before concluding that the array has an electrical fault.

 

Avoid One-Reading Conclusions

 

Solar irradiance can change rapidly.

 

A cloud passing in front of the sun can significantly affect the reading within a short period.

 

Therefore, technicians should avoid drawing major conclusions from one isolated measurement.

 

For better field practice:

 

Take several readings

 

Record the measurement time

 

Note weather conditions

 

Maintain consistent sensor orientation

 

Compare locations within a short time period

 

Repeat questionable measurements

 

This is especially important when using irradiance data for troubleshooting.

 

Solar Irradiance Measurement During Commissioning

 

Solar irradiance measurements can also be useful when commissioning a newly installed photovoltaic system.

 

The technician can document environmental conditions at the time system measurements are taken.

 

For example, a commissioning report might include:

 

Solar Irradiance: 880 W/m虏

Ambient Condition: Clear sky

PV Array Condition: Clean

Shading: None observed

 

This gives future technicians more context when reviewing the original commissioning data.

 

Solar Irradiance Measurement During Preventive Maintenance

 

Preventive maintenance is not only about cleaning panels.

 

A structured maintenance visit may include:

 

Visual inspection

 

Panel condition inspection

 

Cable inspection

 

Connector inspection

 

Inverter checks

 

Electrical measurements

 

Solar irradiance measurement

 

Temperature measurement

 

Performance comparison

 

Recording solar irradiance allows system performance observations to be linked to the sunlight conditions present during the maintenance visit.

 

Useful for Commercial and Industrial Solar Projects

 

Malaysia has many commercial and industrial buildings suitable for rooftop PV systems.

 

Factories, warehouses, shopping centres, offices and other facilities may have large roof areas where solar exposure differs from one section to another.

 

A portable solar power meter such as the TENMARS TM-751 can therefore be useful for:

 

Solar EPC contractors

 

PV installers

 

Electrical contractors

 

Facility managers

 

Maintenance companies

 

Engineering consultants

 

Energy management teams

 

It is compact enough to be used as a supporting field instrument during regular site work.

 

Solar Power Meter vs Visual Weather Observation

 

Terms such as:

 

Sunny

 

Partly cloudy

 

Very bright

 

are useful descriptions, but they are subjective.

 

A solar power meter provides an actual numerical measurement.

 

Instead of:

 

"Solar radiation was strong."

 

a technician can record:

 

Solar Irradiance: 960 W/m虏

 

This improves the quality of technical documentation and makes future comparisons easier.

 

Solar Power Meter vs Lux Meter for PV Work

 

A lux meter measures illuminance in lux and is primarily associated with visible light measurement.

 

For photovoltaic work, technicians are often interested in solar radiation intensity.

 

The TENMARS TM-751 measures solar radiation in W/m虏, making it more relevant when solar irradiance is the required parameter.

 

Selecting the correct instrument helps avoid confusing lighting measurements with solar radiation measurements.

 

Build Better PV Inspection Records

 

One of the simplest benefits of carrying a solar power meter is better documentation.

 

A PV inspection report can include:

 

Date:

Time:

Location:

Solar Irradiance:

Weather:

PV Array:

Panel Orientation:

Shading Condition:

System Output:

Technician Remarks:

 

Over time, these records can become useful when comparing system conditions across different maintenance visits.

 

TENMARS TM-751 for Solar Contractors in Malaysia

 

The TENMARS TM-751 provides a practical way to add solar irradiance measurement to photovoltaic site inspections.

 

It does not replace a complete solar PV analyser, shading analysis system or professional engineering assessment.

 

Instead, it gives technicians an immediate answer to one important question:

 

How much solar radiation is reaching this location right now?

 

For solar installation, commissioning, maintenance and troubleshooting, that measurement can provide valuable context.

 

Looking for TENMARS TM-751 Solar Power Meter in Malaysia?

 

MTM Precision supplies testing and measurement instruments for solar PV, electrical, environmental and industrial applications.

 

Contact us for enquiries about the TENMARS TM-751 Solar Power Meter and suitable measurement instruments for solar installation, site inspection and maintenance work in Malaysia.

 

Contact MTM Precision

 

MTM Precision Sdn. Bhd.

 

Showroom & Service Centre

 

No. 29-1 & 29-2, Jalan Bandar 18,

Pusat Bandar Puchong,

47160 Puchong, Selangor, Malaysia

 

🌐 Website: www.mtmpre.com.my

📧 Email: mtmpre@yahoo.com

📱 WhatsApp: +6016-660 7346


 

13 Aug 2026