Solar PV Commissioning Checklist Using UNI-T UT381PV Malaysia

Solar PV Commissioning Checklist Using UNI-T UT381PV Malaysia Content Solar PV commissioning confirms that a newly installed system has been positioned correctly and is ready for further electrical performance and safety testing. The UNI-T UT381PV Solar Irradiance Meter helps contractors record the environmental and installation conditions present during commissioning, including solar irradiance, panel temperature, inclination and azimuth. Review the Project Information Before starting measurements, confirm: Project name and location Solar panel model Number of panels and strings Inverter configuration Designed panel inclination Designed panel orientation Installation drawings Required commissioning procedure Site safety requirements The UT381PV measures actual site conditions. Its readings should be compared with the approved project information. Inspect the Solar Panels Complete a visual inspection before taking measurements. Check for: Cracked or damaged panel glass Loose panels or mounting clamps Uneven panel alignment Damaged cables Loose or incomplete connectors Incorrect cable support Shading from nearby structures Dust or construction residue Incorrect panel labels Signs of water ingress Record any defect and its exact location. Measure Solar Irradiance The UT381PV measures solar irradiance from 0 to 1400 W/m². Position the sensor in the same plane as the solar panels. Ensure it is not shaded by your body, tools or nearby structures. Record the irradiance at approximately the same time as electrical measurements. Changing sunlight can affect the comparison between strings or arrays. If irradiance is unstable because of passing clouds, note this limitation in the commissioning report. Record Ambient and Panel Temperatures The UT381PV measures temperatures from −40°C to 120°C. Attach the supplied suction-cup temperature probe securely to the panel surface and allow the reading to stabilise. Record: Ambient temperature Panel surface temperature Solar irradiance Measurement time Weather condition Panel temperature provides important context when reviewing voltage and power measurements. Verify the Panel Inclination The UT381PV measures inclination from −90° to +90°. Check representative panels across the installation rather than measuring only one panel. Compare the readings with the required design angle. Inspect further if: One panel has a different angle Panel rows are uneven Mounting brackets appear loose Roof sections have inconsistent alignment A structure appears to have shifted Record the panel or row identification together with each measurement. Confirm the Azimuth Direction The UT381PV measures azimuth from 0° to 360°. Perform compass calibration before critical measurements and keep the instrument away from strong magnetic fields or large metal objects where possible. Compare the measured direction with the installation drawing. Repeat the measurement if: The reading is unstable The result does not match the design Large metal structures are nearby Different panel rows produce inconsistent readings Check for Shading Observe the site for shading from: Trees Antennas Water tanks Roof structures Nearby buildings Electrical equipment Other panel rows Temporary construction items Shading may change during the day. Record the time and location of any visible shadow. When necessary, use UT381PV data logging to monitor changing irradiance as shadows move across the array. Record and Store the Measurements The UT381PV stores up to 12,800 measurement sets and supports recording intervals from one second to 60 minutes. Bluetooth connection to the UNI-T iENV App helps technicians review the measurement data. A commissioning record should include: Date and time Site location Panel or array identification Solar irradiance Ambient temperature Panel surface temperature Inclination angle Azimuth direction Weather condition Shading observations Visible defects Technician’s name Keep the environmental readings together with the related electrical test results. Additional Electrical Tests The UT381PV does not replace the electrical safety and performance tests required during PV commissioning. Depending on the project, additional instruments may be required for: Polarity verification Open-circuit voltage Short-circuit current String operating current Insulation resistance Earth continuity I-V curve testing Inverter testing Thermal inspection Protective-device verification All electrical testing should be completed by qualified personnel using the appropriate procedures and safety equipment. Final Commissioning Review Before completing the report, confirm that: Panel orientation matches the design Inclination is consistent Irradiance was recorded during electrical testing Ambient and panel temperatures were documented Shading conditions were noted Visible installation defects were recorded Measurement locations are identifiable Unstable weather conditions are stated Additional electrical results are attached Corrective actions are clearly listed The UT381PV provides environmental and positioning data that improves the quality of the overall commissioning record. For assistance selecting the UNI-T UT381PV for solar PV commissioning work in Malaysia, contact MTM Precision. MTM Precision Sdn Bhd Showroom & Service Centre: No. 29-1 & 29-2, Jalan Bandar 18, Pusat Bandar Puchong, 47160 Puchong, Selangor, Malaysia Tel: 03-8080 7172 WhatsApp: +6016-660 7346 Email: mtmpre@yahoo.com Website: www.mtmpre.com.my

30 Sep 2026